Known Unknowns in Large-Scale System Monitoring

نویسندگان

  • Navendu Jain
  • Dmitry Kit
  • Prince Mahajan
  • Praveen Yalagandula
  • Mike Dahlin
  • Yin Zhang
چکیده

This paper addresses a central challenge in PRISM, a large-scale distributed monitoring system: coping with the uncertainties and ambiguities introduced by network and node failures. In particular, in a large scale monitoring system, such failures interact badly with techniques needed for scalability like hierarchy, arithmetic filtering, and temporal batching. For example, if a monitoring subtree is silent over an interval, it is difficult to distinguish between two cases: (a) the subtree has sent no updates because the inputs have not significantly changed or (b) the inputs have significantly changed but the subtree is unable to transmit its report. As a result, reported results can be arbitrarily far from their true values. To address this challenge PRISM introduces Network Imprecision (NI), a new metric to characterize accuracy despite node failures, network disruptions, and system reconfigurations. PRISM leverages NI to flag potentially inaccurate results, allowing applications to differentiate between known-correct and likely-erroneous results as well as to correct distorted results by applying several redundancy techniques. Evaluation of our PRISM prototype shows that NI effectively flags inaccurate query results while incurring low overheads, and we find that using NI to automatically select the best results can reduce the inaccuracy in a PRISM-based monitoring service by nearly a factor of five.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Towards Measuring the Project Management Process During Large Scale Software System Implementation Phase

Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...

متن کامل

A Variable Structure Observer Based Control Design for a Class of Large scale MIMO Nonlinear Systems

This paper fully discusses how to design an observer based decentralized fuzzy adaptive controller for a class of large scale multivariable non-canonical nonlinear systems with unknown functions of subsystems’ states. On-line tuning mechanisms to adjust both the parameters of the direct adaptive controller and observer that guarantee the ultimately boundedness of both the tracking error and tha...

متن کامل

Evaluation of Close-Range Photogrammetric Technique for Deformation Monitoring of Large-Scale Structures: A review

Close-range photogrammetry has been used in many applications in recent decades in various fields such as industry, cultural heritage, medicine and civil engineering. As an important tool for displacement measurement and deformation monitoring, close-range photogrammetry has generally been employed in industrial plants, quality control and accidents. Although close-range photogrammetric applica...

متن کامل

Generation Scheduling in Large-Scale Power Systems with Wind Farms Using MICA

The growth in demand for electric power and the rapid increase in fuel costs, in whole of theworld need to discover new energy resources for electricity production. Among of the nonconventionalresources, wind and solar energy, is known as the most promising deviceselectricity production in the future. In this thesis, we study follows to long-term generationscheduling of power systems in the pre...

متن کامل

COMPUTATIONALLY EFFICIENT OPTIMUM DESIGN OF LARGE SCALE STEEL FRAMES

Computational cost of metaheuristic based optimum design algorithms grows excessively with structure size. This results in computational inefficiency of modern metaheuristic algorithms in tackling optimum design problems of large scale structural systems. This paper attempts to provide a computationally efficient optimization tool for optimum design of large scale steel frame structures to AISC...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007