Idiosyncratic Gap: A Tough Problem to Structure-bound Machine Translation

نویسنده

  • Yoshihiko Nitta
چکیده

Current practical machine translation systems (MT, in s h o r t ) , which a r e d e s i g n e d t o d e a l w i t h a h u g e a m o u n t o f d o c u m e n t , a r e g e n e r a l ] y s t r u c t u r e b o u n d . T h a t i s , t h e t r a n s l a t i o n p r o c e s s i s d o n e b a s e d on t i l e analysis and transformation of the structure of source sentence, not on the understanding and paraphrasing of the meaning of that. But each language has its own :~yntactic and semantic idiosyncrasy, and on this account, without understanding the total meaning of source sentences it is often difficult for MT to bridge properly the idiosyncratic gap between source~ and targetlanguage. A somewhat new method called "Cross Translation Test (CTT, in short)" is presented that reveals the detail of idiosyncratic gap (IG, in short) together with the so-so satisfiable possibility of MT. It is also mentioned the usefulness olf sublanguage approach to reducing the IC between sourceand targetlanguage.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Single Machine Sequencing Problem with Idle Insert: Simulated Annealing and Branch-and-Bound Methods

  In this paper, a single machine sequencing problem is considered in order to find the sequence of jobs minimizing the sum of the maximum earliness and tardiness with idle times (n/1/I/ETmax). Due to the time complexity function, this sequencing problem belongs to a class of NP-hard ones. Thus, a special design of a simulated annealing (SA) method is applied to solve such a hard problem. To co...

متن کامل

A New Branch-and-Bound for the Problem of Mean Completion Time for the Single Machine with Release Time

Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...

متن کامل

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...

متن کامل

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1986