A Simulated Annealing Algorithm for System-on-Chip Test Scheduling with, Power and Precedence Constraints

نویسندگان

  • Haidar M. Harmanani
  • Hassan A. Salamy
چکیده

This paper presents an efficient method to determine minimum System-OnChip (SOC) test schedules with precedence and power constraints based on simulated annealing. The problem is solved using a partitioned testing scheme with run to completion that minimizes the number of idle test slots. The method can handle SOC test scheduling with and without power constraints in addition to precedence constraints that preserve desirable orderings among tests. We present experimental results for various SOC examples that demonstrate the effectiveness of the method. The method achieved optimal test schedules in all attempted cases in a short CPU time.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Quay Cranes and Yard Trucks Scheduling Problem at Container Terminals

A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...

متن کامل

A Routing-Aware Simulated Annealing-based Placement Method in Wireless Network on Chips

Wireless network on chip (WiNoC) is one of the promising on-chip interconnection networks for on-chip system architectures. In addition to wired links, these architectures also use wireless links. Using these wireless links makes packets reach destination nodes faster and with less power consumption. These wireless links are provided by wireless interfaces in wireless routers. The WiNoC archite...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

An Integrated Model of Project Scheduling and Material Ordering: A Hybrid Simulated Annealing and Genetic Algorithm

This study aims to deal with a more realistic combined problem of project scheduling and material ordering. The goal is to minimize the total material holding and ordering costs by determining the starting time of activities along with material ordering schedules subject to some constraints. The problem is first mathematically modelled. Then a hybrid simulated annealing and genetic algorithm is...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • International Journal of Computational Intelligence and Applications

دوره 6  شماره 

صفحات  -

تاریخ انتشار 2006