Resource-Bounded Machines are Motivated to be Effective, Efficient, and Curious

نویسندگان

  • Bas R. Steunebrink
  • Jan Koutník
  • Kristinn R. Thórisson
  • Eric Nivel
  • Jürgen Schmidhuber
چکیده

Resource-boundedness must be carefully considered when designing and implementing artificial general intelligence (AGI) algorithms and architectures that have to deal with the real world. But not only must resources be represented explicitly throughout its design, an agent must also take into account their usage and the associated costs during reasoning and acting. Moreover, the agent must be intrinsically motivated to become progressively better at utilizing resources. This drive then naturally leads to effectiveness, efficiency, and curiosity. We propose a practical operational framework that explicitly takes into account resource constraints: activities are organized to maximally utilize an agent’s bounded resources as well as the availability of a teacher, and to drive the agent to become progressively better at utilizing its resources. We show how an existing AGI architecture called AERA can function inside this framework. In short, the capability of AERA to perform self-compilation can be used to motivate the system to not only accumulate knowledge and skills faster, but also to achieve goals using less resources, becoming progressively more effective and efficient.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Moving from a National Model toward a Provincial Model of Empowerment for Managers and Executives in Public Sector: A Case Study

The first aim of this study is to assess the effectiveness of activities, strategies and processes associated with managers’ empowerment based on the National Human Resource Empowerment Model in Iran. The second aim is to propose a provincial model of human resources empowerment for managers and executives. To collect data, a qualitative research approach including semi-structured interviews an...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

A hybrid GRASP algorithm for minimizing total weighted resource tardiness penalty costs in scheduling of project networks

In this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. In this problem, we assume constrained resources are renewable and limited to very costly machines and tools which are also used in other projects and are not accessible in all periods of time of a project. In other words, there is a dictated ready date as well as a d...

متن کامل

AN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK

Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013