A multi-objective GA-based optimisation for holistic Manufacturing, transportation and Assembly of precast construction

نویسندگان

  • B. Anvari
  • P. Angeloudis
  • W. Y. Ochieng
چکیده

Resource scheduling of construction proposals allows project managers to assess resource requirements, provide costs and analyse potential delays. The Manufacturing, transportation and Assembly (MtA) sectors of precast construction projects are strongly linked, but considered separately during the scheduling phase. However, it is important to evaluate the cost and time impacts of consequential decisions frommanufacturing up to assembly. In this paper, a multi-objective Genetic Algorithm-based (GA-based) searching technique is proposed to solve unifiedMtA resource scheduling problems (which are equivalent to extended Flexible Job Shop Scheduling Problems). To the best of the authors’ knowledge, this is the first time that a GA-based optimisation approach is applied to a holistic MtA problem with the aim of minimising time and cost while maximising safety. The model is evaluated and compared to other exact and non-exact models using instances from the literature and scenarios inspired from real precast constructions. Crown Copyright © 2016 Published by B.V. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimisation of assembly scheduling in VCIM systems using genetic algorithm

Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional computer-integrated manufacturing (CIM) system to global level. Assembly scheduling in VCIM systems is ...

متن کامل

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

متن کامل

The Comparison of Imperialist Competitive Algorithm Applied and Genetic Algorithm for Machining Allocation of Clutch Assembly (TECHNICAL NOTE)

The allocation of design tolerances between the components of a mechanical assembly and manufacturing tolerances can significantly affect the functionality of products and related production costs. This paper introduces Imperialist Competitive Algorithm (ICA) approach to solve the machining tolerance allocation of an overrunning clutch assembly.  The objective is to obtain optimum tolerances of...

متن کامل

A Multi-objective Mixed Model Two-sided Assembly Line Sequencing Problem in a Make –To- Order Environment with Customer Order Prioritization

Mixed model two-sided assembly lines (MM2SAL) are applied to assemble large product models, which is produced in high-volume. So, the sequence planning of products to reduce cost and increase productivity in this kind of lines is imperative. The presented problem is tackled in two steps. In step 1, a framework is developed to select and prioritize customer orders under the finite capacity of th...

متن کامل

Multi-Objective Lead Time Control in Multistage Assembly Systems (TECHNICAL NOTE)

In this paper we develop a multi-objective model to optimally control the lead time of a multistage assembly system. The multistage assembly system is modeled as an open queueing network, whose service stations represent manufacturing or assembly operations. The arrival processes of the individual parts of the product, which should be assembled to each other in assembly stations, are assumed to...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016