Exact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environment

نویسندگان

  • Fabrice Talla Nobibon
  • Roel Leus
چکیده

This paper studies a generalization of the order acceptance and scheduling problem in a single-machine environment where a pool consisting of firm planned orders as well as potential orders is available from which an over-demanded company can select. The capacity available for processing the accepted orders is limited and each order is characterized by a known processing time, delivery date, revenue and a weight representing a penalty per unit-time delay beyond the delivery date. We prove that the existence of a constant-factor approximation algorithm for this problem is unlikely. We propose two linear formulations that are solved using an IP solver and we devise two exact branch-and-bound procedures able to solve instances with up to 50 jobs within reasonable CPU times. We compare the efficiency and quality of the results obtained using the different solution approaches.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes

In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem.  Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...

متن کامل

GENETIC AND TABU SEARCH ALGORITHMS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DETERIORATING JOBS

 This paper introduces the effects of job deterioration and sequence dependent set- up time in a single machine scheduling problem. The considered optimization criterion is the minimization of the makespan (Cmax). For this purpose, after formulating the mathematical model, genetic and tabu search algorithms were developed for the problem. Since population diversity is a very important issue in ...

متن کامل

Minimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem

  This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...

متن کامل

JIT single machine scheduling problem with periodic preventive maintenance

This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...

متن کامل

Genetic and Improved Shuffled Frog Leaping Algorithms for a 2-Stage Model of a Hub Covering Location Network

    Hub covering location problem, Network design,   Single machine scheduling, Genetic algorithm,   Shuffled frog leaping algorithm   Hub location problems (HLP) are synthetic optimization problems that appears in telecommunication and transportation networks where nodes send and receive commodities (i.e., data transmissions, passengers transportation, express packages, postal deliveries, etc....

متن کامل

Efficient Algorithms for Just-In-Time Scheduling on a Batch Processing Machine

Just-in-time scheduling problem on a single batch processing machine is investigated in this research. Batch processing machines can process more than one job simultaneously and are widely used in semi-conductor industries. Due to the requirements of just-in-time strategy, minimization of total earliness and tardiness penalties is considered as the criterion. It is an acceptable criterion for b...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Computers & OR

دوره 38  شماره 

صفحات  -

تاریخ انتشار 2011