Hydro Generating Units Maintenance Scheduling Using Benders Decomposition

نویسندگان

  • Igor Kuzle
  • Hrvoje Pandžić
  • Miljenko Brezovec
چکیده

Preventive generating units maintenance scheduling is among the most vital decisions which electricity generating companies have to make. Effective generating units maintenance helps reduce the forced outage rates. Therefore, rigorous technical restrictions have to be respected by all means. Since the economical factor, i.e. profit generation, was not the prime driver in investments, the maintenance in vertically integrated power systems was carried out thoroughly and most of the elements of the power system were over-dimensioned. These proper maintenance procedures resulted in extremely rare failures in the vertically integrated power system operation. After the implementation of the electricity market, economic drive grew stronger and private companies wanted to avoid any unnecessary investments in order to increase their profit margin. The maintenance enforcement expenses have two aspects. The first one is the cost of the maintenance itself, which includes the newly installed components, specialized teams hiring, etc. The other part of the expenses is the missed income due to undelivered electricity. Therefore, the maintenance has to be performed in the shortest period possible. Other factors, such as electricity and fuel prices also have to be taken into consideration. Since the hydro power plant's owners do not have to buy fuel, their objective is to predict the water inflows and schedule the maintenance in low river inflow period.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

SOCRATES: A system for scheduling hydroelectric generation under uncertainty

The Pacific Gas and Electric Company, the largest investor-owned energy utility in the United States, obtains a significant fraction of its electric energy and capacity from hydrogeneration. Although hydro provides valuable flexibility, it is subject to usage limits and must be carefully scheduled. In addition, the amount of energy available from hydro varies widely from year to year, depending...

متن کامل

Long Term Cost Effective Preventive Maintenance Scheduling

Preventive maintenance scheduling of generating units is addressed as a long-term scheduling in power system studies aiming to increase the reliability incorporating cost reduction. It consists of knowing which generating units should be shut down for regular safety inspection. In this paper, a new formulation of preventive maintenance scheduling associated with cost reduction index (CRI) is pr...

متن کامل

Benders’ decomposition algorithm to solve bi-level bi-objective scheduling of aircrafts and gate assignment under uncertainty

Management and scheduling of flights and assignment of gates to aircraft play a significant role to improve the performance of the airport, due to the growing number of flights and decreasing the flight times. This research addresses the assignement and scheduling problem of runways and gates simultaneously. Moreover, this research is the first study that considers the constraint of unavailabil...

متن کامل

Mobile Agent Software Applied in Maintenance Scheduling

The deregulation in power systems brings some new issues in equipment maintenance scheduling where more coordination and communication among different entities is required. In this paper, the mobile agent software is applied in the facility maintenance scheduling in deregulated power systems environment. In the given example, the problem is de-coupled into a master problem and a sub-problem usi...

متن کامل

Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm

We study an assignment type resource-constrained project scheduling problem with resources being multi-skilled personnel to minimize the total staffing costs. We develop a hybrid Benders decomposition (HBD) algorithm that combines the complimentary strengths of both mixed-integer linear programming (MILP) and constraint programming (CP) to solve this NP-hard optimization problem. An effective c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010