Three Mechanisms for Managing Resource Constraints in a Library for Constraint-based Scheduling*

نویسنده

  • Claude Le Pape
چکیده

ILOG SCHEDULE is a C++ library aimed at simplifying the development of industrial scheduling applications. SCHEDULE is based on SOLVER, a generic tool for object-oriented constraint programming. SCHEDULE includes three categories of predefined constraints: temporal constraints, capacity constraints, and resource utilization constraints. Three distinct mechanisms are available to deal with resource utilization constraints. The first mechanism relies on explicit time-tables to maintain information about the variations of resource utilization and resource availability over time. The second mechanism relies on a generic disjunctive constraint which ensures that incompatible activities (for example, activities which require a common resource of capacity 1) cannot overlap in time. The third mechanism, known as edge-finding, considers arbitrary tuples {A1 ... An} of activities to prove that some activity Ai must execute first, or must execute last, among {A1 ... An}. The edge-finding mechanism is a priori more CPU-time consuming than the two other mechanisms, but results in the assignment of more precise earliest and latest start and end times to activities. Each of the three mechanisms is useful, as the time-table and disjunctive mechanisms enable the expression of wider classes of constraints, while edge-finding is in general the most effective in pruning the search space.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

Multi-objective scheduling and assembly line balancing with resource constraint and cost uncertainty: A “box” set robust optimization

Assembly lines are flow-oriented production systems that are of great importance in the industrial production of standard, high-volume products and even more recently, they have become commonplace in producing low-volume custom products. The main goal of designers of these lines is to increase the efficiency of the system and therefore, the assembly line balancing to achieve an optimal system i...

متن کامل

Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

متن کامل

A novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study

Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...

متن کامل

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...