Preemptive scheduling on uniformly related machines: minimizing the sum of the largest pair of job completion times

نویسندگان

  • Leah Epstein
  • Ido Yatsiv
چکیده

We revisit the classic problem of preemptive scheduling on m uniformly related machines. In this problem, jobs can be arbitrarily split into parts, under the constraint that every job is processed completely, and that the parts of a job are not assigned to run in parallel on different machines. We study a new objective which is motivated by fairness, where the goal is to minimize the sum of the two maximal job completion times. We design a polynomial time algorithm for computing an optimal solution. The algorithm can act on any set of machine speeds and any set of input jobs. The algorithm has several cases, many of which are very different from algorithms for makespan minimization (algorithms that minimize the maximum completion time of any job), and from algorithms that minimize the total completion time of all jobs.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

متن کامل

Virtual manufacturing cells scheduling considering lotstreaming and sequence dependent setup times

In this paper, a new mathematical model for the problem of job scheduling in virtual manufacturing cells (VMC) is presented to minimizing the completion time of all jobs. Sequence dependent setup times of machines is considered and lot-streaming is possible. In Virtual manufacturing cells, each job has a different processing path and there is a set of machines for processing each operation. The...

متن کامل

Online Preemptive Scheduling on Parallel Machines

We consider an online version of the classical problem of preemptive scheduling on uniformly related machines. We are given m machines with speeds s 1 ≥ s 2 ≥. .. ≥ s m and a sequence of jobs, each described by its processing time (length). The actual time needed to process a job with length p on a machine with speed s is p/s. In the preemptive version, each job may be divided into several piec...

متن کامل

Stochastic Online Scheduling with Precedence Constraints

We consider the preemptive and non-preemptive problems of scheduling jobs with precedence constraints on parallel machines with the objective to minimize the sum of (weighted) completion times. We investigate an online model in which the scheduler learns about a job when all its predecessors have completed. For scheduling on a single machine, we show matching lower and upper bounds of Θ(n) and ...

متن کامل

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • J. Scheduling

دوره 20  شماره 

صفحات  -

تاریخ انتشار 2017