A Model for Multi-Plant Production Planning Coordination
نویسندگان
چکیده
This paper deals with the problem of coordinating production planning process that becomes more complex in today’s highly competitive manufacturing environment. Our main concern is to develop a model for coordinating the multiplant production planning when the demand at any plant can be satisfied by producing at any other plant. The proposed model uses the multi-agent system and linear programming technique to achieve minimized production cost, increased flexibility and faster response.
منابع مشابه
A Simulation-Optimization Model For Capacity Coordination In Make To Stock/Make To Order Production Environments
Capacity coordination, as the tactical level of hierarchical production planning in hybrid MTS/MTO systems, includes numerous important decisions. In this paper, two of these decisions i.e. finding the best strategy for the acceptance/rejection of incoming orders and determining orders’ due dates – are investigated. Also a simulation model is proposed to evaluate the efficiency of the presented...
متن کاملA BI-LEVEL LINEAR MULTI-OBJECTIVE DECISION MAKING MODEL WITH INTERVAL COEFFICIENTS FOR SUPPLY CHAIN COORDINATION
Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible to define multi-level programs with any number of levels. Supply chain planning problems are co...
متن کاملA bi-level linear multi-objective decision making model with interval coefficients for supply chain coordination
Abstract: Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible to define multi-level programs with any number of levels. Supply chain planning problem...
متن کاملDesigning an integrated production/distribution and inventory planning model of fixed-life perishable products
This paper aims to investigate the integrated production/distribution and inventory planning for perishable products with fixed life time in the constant condition of storage throughout a two-echelon supply chain by integrating producers and distributors. This problem arises from real environment in which multi-plant with multi-function lines produce multi-perishable products with fixed life ti...
متن کاملBuilding a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Int. Arab J. Inf. Technol.
دوره 2 شماره
صفحات -
تاریخ انتشار 2005