We present a solution methodology to obtain near-optimal solutions for the problem of scheduling multiple products on a network of single-stage, unrelated parallel units using simulated annealing (SA) with a performance criterion based on tardiness minimization. The approach incorporates sequence dependent clean-up times, varying processing rates for different products on different units, and constraints on feasible product-to-unit assignments. Near-optimal solutions are obtained for problems with 20-100 products and 3-11 units. A comparison is made between solutions obtained by SA, solutions obtained by the heuristic improvement method of Musier and Evans for similar computational effort, and solutions obtained by a list scheduling algorithm.
منابع مشابه
A cloud-based simulated annealing algorithm for order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling
Make-to-order is a production strategy in which manufacturing starts only after a customer's order is received; in other words, it is a pull-type supply chain operation since manufacturing is carried out as soon as the demand is confirmed. This paper studies the order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling with MTO production strategy, the objec...
متن کاملHybrid artificial immune system and simulated annealing algorithms for solving hybrid JIT flow shop with parallel batches and machine eligibility
This research deals with a hybrid flow shop scheduling problem with parallel batching, machine eligibility, unrelated parallel machine, and different release dates to minimize the sum of the total weighted earliness and tardiness (ET) penalties. In parallel batching situation, it is supposed that number of machine in some stages are able to perform a certain number of jobs simultaneously. First...
متن کاملA Heuristic Algorithm Approach for Scheduling of Multi-criteria Unrelated Parallel Machines
In this paper we address a multi-objective scheduling problem for unrelated parallel machines. In unrelated parallel systems, the processing cost/time of a given job on different machines may vary. The objective of scheduling is to simultaneously determine the job-machine assignment and job sequencing on each machine. In such a way the total cost of the schedule is minimized. The cost function ...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flowtime through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters with it, this is why in recent decades extensive researches have been done on scheduling issues. A type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical ...