W[2]-hardness of precedence constrained K-processor scheduling
نویسندگان
چکیده
It is shown that the Precedence Constrained K-Processor Scheduling problem is W [2]-hard. This means that there does not exist a constant c, such that for all xed K, the Precedence Constrained K-Processor Scheduling problem can be solved in O(nc) time, unless an unlikely collapse occurs in the parameterized complexity hierarchy introduced by Downey and Fellows (see [5]). That is, if the problem can be solved in polynomial time for each xed K, then it is likely that the degree of the running time polynomial must increase as the number of processors K increases.
منابع مشابه
Towards Tight Lower Bounds for Scheduling Problems
We show a close connection between structural hardness for k-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite structural hardness result of [1], we obtain a hardness of 2 − for the problem of minimising the makespan for scheduling precedence-constrained jobs with preemption o...
متن کاملNP - Completeness for Problems of BoundedWidth :
The parameterized computational complexity of a collection of well-known problems including: Bandwidth, Precedence constrained k-processor scheduling, Longest Common Subsequence, DNA physical mapping (or Intervalizing colored graphs), Perfect phylogeny (or Triangulating colored graphs), Colored cutwidth, and Feasible register assignment is explored. It is shown that these problems are hard for ...
متن کاملK-processor Scheduling
It is shown that the Precedence Constrained K-Processor Scheduling problem is W2]-hard. This means that there does not exist a constant c, such that for all xed K, the Precedence Constrained K-Processor Scheduling problem can be solved in O(n c) time, unless an unlikely collapse occurs in the parameter-ized complexity hierarchy introduced by Downey and Fellows (see 5]). That is, if the problem ...
متن کاملAn improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...
متن کاملProbabilistic Analysis of Scheduling Precedence Constrained Parallel Tasks on Multicomputers with Contiguous Processor Allocation
ÐGiven a set of precedence constrained parallel tasks with their processor requirements and execution times, the problem of scheduling precedence constrained parallel tasks on multicomputers with contiguous processor allocation is to find a nonpreemptive schedule of the tasks on a multicomputer such that the schedule length is minimized. This scheduling problem is substantially more difficult t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Oper. Res. Lett.
دوره 18 شماره
صفحات -