Maximizing Availability: A Commitment Heuristic for Oversubscribed Scheduling Problems
نویسندگان
چکیده
In this paper we reconsider a “task-swapping” procedure for improving schedules in the face of resource oversubscription. Prior work has demonstrated that use of a retraction heuristic to determine which tasks to rearrange in an existing schedule allows for addition of new tasks which would otherwise fail to be scheduled. The existing task swap procedure employs a variable ordering heuristic for task insertion that is the same as the retraction heuristic, but scored in the reverse. That is, the least constrained tasks are retracted, and of these the most constrained are committed first. Value selection for commitment is defaulted to a task’s earliest feasible start time. We have found that by applying a value selection heuristic, maxavailability, to the choice of where to assign the retracted tasks, both solution quality and runtime performance of task swap can be improved greatly. Max-availability considers resource contention for an unassigned task and places it where availability is predicted to be maximal over the range of that task. This heuristic is applicable not only in a repair context, but can also promote resource levelling in the context of constructive task allocation. Finally, we show that use of max-availability in task swapping promotes schedule stability when compared to the prior greedy task insertion policy.
منابع مشابه
Resource Contention Metrics for Oversubscribed Scheduling Problems
We investigate a task insertion heuristic for oversubscribed scheduling problems, max-availability, that uses a simple estimate of resource contention to assign tasks to intervals expected to have the best worst case resource availability. Prior research in value and variable ordering heuristics for scheduling problems indicated that sophisticated, but more costly measures of resource contentio...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA).
In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have ...
متن کاملA Heuristic Algorithm for Project Scheduling Problem to Maximizing the Net Present Value
This paper deals with resource unconstrained project scheduling problems with the objective of maximizing the net present value (NPV) of project cash flows. Here we present a heuristic algorithm named as differential procedure (Dif_AOA). In order to evaluate the efficiency of this algorithm, networks with node numbers between 10-1000 and network complexity coefficients between 1.3-6.6 have be...
متن کاملMinimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملMaximizing Flexibility: A Retraction Heuristic for Oversubscribed Scheduling Problems
In this paper we consider the solution of scheduling problems that are inherently over-subscribed. In such problems, there are always more tasks to execute within a given time frame than available resource capacity will allow, and hence decisions must be made about which tasks should be included in the schedule and which should be excluded. We adopt a controlled, iterative repair search approac...