Estimation of Trade-off between Costs of Preprocessing and Primary Processing
نویسنده
چکیده
People often conduct preprocessing to simplify primary processing. Usually, there is a trade-off between the costs of performing preprocessing and primary processing. Therefore, the utility of preprocessing differs depending on the task complexity. We conducted three experiments to find out whether people could adaptively estimate the utility of preprocessing and then take rational action. The overall result was that in performing a high complexity task, almost all the participants made a rational choice. However, for a low complexity task, the participants gradually learned to conduct preprocessing despite it not being effective. These results were explained based on theoretical perspectives proposed in previous studies.
منابع مشابه
DRIVING OPTIMUM TRADE-OFF BETWEEN THE BENEFITS AND COSTS OF INTERBASIN WATER TRANSFER PROJECTS
The interbasin water transfer is a remedy to mitigate the negative issues of water shortage in arid and semi-arid regions. In a water transfer project the receiving basin always benefits while, the sending basin may suffer. In this study, the project of interbasin water transfer from Dez water resources system in south-west of Iran to the central part of the contrary is investigated during...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملA New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value
Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...
متن کاملA Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing
In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexibl...
متن کاملThe determinants of capital structure across firms’ sizes: The U.K evidence
This paper explores the leverage determinants across firms’ sizesbased on the two main theories behind the capital structure, the trade-offand the pecking order theories. A panel data is sued to find therelationship between capital structure and the variables that proxy forbenefits and costs of debt during 1990 to 2006. Our findings show thatboth principles help to explain the capital structure...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2010