A Greedy Heuristic for Workforce Scheduling and Routing With Time-dependent Activities Constraints
نویسندگان
چکیده
We present a greedy heuristic (GHI) designed to tackle five time-dependent activities constraints (synchronisation, overlap, minimum difference, maximum difference and minimum-maximum difference) on workforce scheduling and routing problems. These types of constraints are important because they allow the modelling of situations in which activities relate to each other time-wise, e.g. synchronising two technicians to complete a job. These constraints often make the scheduling and routing of employees more difficult. GHI is tested on set of benchmark instances from different workforce scheduling and routing problems (WSRPs). We compare the results obtained by GHI against the results from a mathematical programming solver. The comparison seeks to determine which solution method achieves more best solutions across all instances. Two parameters of GHI are discussed, the sorting of employees and the sorting of visits. We conclude that using the solver is adequate for instances with less than 100 visits but for larger instances GHI obtains better results in less time.
منابع مشابه
Mixed Integer Programming with Decomposition for Workforce Scheduling and Routing with Time-dependent Activities Constraints
We present a mixed integer programming decomposition approach to tackle workforce scheduling and routing problems (WSRP) that involve time-dependent activities constraints. The proposed method is called repeated decomposition with conflict repair (RDCR) and it consists of repeatedly applying a phase of problem decomposition and sub-problem solving, followed by a phase dedicated to conflict repa...
متن کاملOptimisation models and algorithms for workforce scheduling and routing
This thesis investigates the problem of scheduling and routing employees that are required to perform activities at clients’ locations. Clients request the activities to be performed during a time period. Employees are required to have the skills and qualifications necessary to perform their designated activities. The working time of employees must be respected. Activities could require more th...
متن کاملRouting and Production Scheduling for a Mobile Factory
In last decades, mobile factories have been used due to their high production capability, carrying their equipment and covering rough and uneven routes. Nowadays, more companies use mobile factories with the aim of reducing the transportation and manufacturing costs. The mobile factory must travel between the suppliers, visit all of them in each time period and return to the initial location of...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملAn Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2015