Iterative bidding in electricity markets: rationality and robustness

نویسندگان

  • Ashish Cherukuri
  • Jorge Cortés
چکیده

This paper studies an electricity market consisting of an independent system operator (ISO) and a group of generators. The goal is to solve the DC optimal power flow (DC-OPF) problem: have the generators collectively meet the power demand while minimizing the aggregate generation cost and respecting line flow limits in the network. The ISO by itself cannot solve the DC-OPF problem as generators are strategic and do not share their cost functions. Instead, each generator submits to the ISO a bid, consisting of the price per unit of electricity at which it is willing to provide power. Based on the bids, the ISO decides how much production to allocate to each generator to minimize the total payment while meeting the load and satisfying the line limits. We provide a provably correct, decentralized iterative scheme, termed BID ADJUSTMENT ALGORITHM, for the resulting Bertrand competition game. Regarding convergence, we show that the algorithm takes the generators bids to any desired neighborhood of the efficient Nash equilibrium at a linear convergence rate. As a consequence, the optimal production of the generators converges to the optimizer of the DC-OPF problem. Regarding robustness, we show that the algorithm is robust to affine perturbations in the bid adjustment scheme and that there is no incentive for any individual generator to deviate from the algorithm by using an alternative bid update scheme. We also establish the algorithm robustness to collusion, i.e., we show that, as long as each bus with generation has a generator following the strategy, there is no incentive for any group of generators to share information with the intent of tricking the system to obtain a higher payoff. Simulations illustrate our results.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of Reinforcement Learning Algorithm to Study the Capacity Withholding in Electricity Energy Markets

This paper addresses the possibility of capacity withholding by energy producers, who seek to increase the market price and their own profits. The energy market is simulated as an iterative game, where each state game corresponds to an hourly energy auction with uniform pricing mechanism. The producers are modeled as agents that interact with their environment through reinforcement learning (RL...

متن کامل

Optimal Bidding Strategies of GENCOs in Day-Ahead Energy and Spinning Reserve Markets Based on Hybrid GA-Heuristic Optimization Algorithm

In an electricity market, every generation company (GENCO) attempts to maximize profit according to other participants bidding behaviors and power systems operating conditions. The goal of this study is to examine the optimal bidding strategy problem for GENCOs in energy and spinning reserve markets based on a hybrid GA-heuristic optimization algorithm. The heuristic optimization algorithm used...

متن کامل

A Comprehensive Survey on GenCos’ Optimal Bidding Strategy Problem in Competitive Power Markets

This paper represents a complete survey on Generation Companies’ (GenCos’) optimal bidding strategy problem in restructured power markets. In this regard after an introduction to competitive electricity markets, concept of optimal bidding strategy is presented. Considering large amount of works accomplished in this area a novel classification is implemented in order to categorize the existing d...

متن کامل

Energy management of virtual power plant to participate in the electricity market using robust optimization

Virtual power plant (VPP) can be studied to investigate how energy is purchased or sold in the presence of electricity market price uncertainty. The VPP uses different intermittent distributed sources such as wind turbine, flexible loads, and locational marginal prices (LMPs) in order to obtain profit. VPP should propose bidding/offering curves to buy/sell from/to day-ahead market. In this pape...

متن کامل

Impact of Participants’ Market Power and Transmission Constraints on GenCos’ Nash Equilibrium Point

Unlike perfect competitive markets, in oligopoly electricity markets due to strategic producers and transmission constraints GenCos may increase their own profit through strategic biddings. This paper investigates the problem of developing optimal bidding strategies of GenCos considering participants’ market power and transmission constraints. The problem is modeled as a bi-level optimizati...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • CoRR

دوره abs/1702.06505  شماره 

صفحات  -

تاریخ انتشار 2017