The Fast and the Not-So-Frugal: Human Heuristics for Optimization Problem Solving
نویسندگان
چکیده
In this paper, human heuristics have been identified that provide close to optimal solutions when solving Capacitated Vehicle Routing Problems (CVRPs). Results from previous experiments showed humans can produce good solutions relatively fast that compete with computer-based methods giving further support to previous research on Traveling Salesman Problems (TSPs). Multiple Regression analyses have been conducted to show the best heuristics adopted by participants and that lead to better CVRP solutions. Identified heuristics are categorized in visuospatial and arithmetic heuristics. Visuospatial heuristics (e.g. Clustering, Anchoring) performed better than the arithmetic (e.g. Balancing). Strategy switching appears to be a critical step within CVRP solutions suggesting that heuristics adopted are fast yet notso-frugal, complimenting the fast and frugal toolkit. Results are discussed under the light of problem-solving theories and in terms of how best human heuristics can inform the current state-of-art computational algorithms used in optimization problem solving.
منابع مشابه
Improved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...
متن کاملAn integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method
In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...
متن کاملAn Efficient Hybrid Metaheuristic for Capacitated p-Median Problem
Capacitated p-median problem (CPMP) is a well-known facility-location problem, in which p capacitated facility points are selected to satisfy n demand points in such a way that the total assigned demand to each facility does not exceed its capacity. Minimizing the total sum of distances between each demand point and its nearest facility point is the objective of the problem. Developing an effic...
متن کاملThree Metaheuristic Algorithms for Solving the Multi-item Capacitated Lot-sizing Problem with Product Returns and Remanufacturing
This paper proposes a new mixed integer programming model for multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages in closed-loop supply chains. The returned products from customers can either be disposed or be remanufactured to be sold as new ones again. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA) al...
متن کاملA Comparison of NSGA II and MOSA for Solving Multi-depots Time-dependent Vehicle Routing Problem with Heterogeneous Fleet
Time-dependent Vehicle Routing Problem is one of the most applicable but least-studied variants of routing and scheduling problems. In this paper, a novel mathematical formulation of time-dependent vehicle routing problems with heterogeneous fleet, hard time widows and multiple depots, is proposed. To deal with the traffic congestions, we also considered that the vehicles are not forced to come...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -