On single-walk parallelization of the job shop problem solving algorithms

نویسنده

  • Wojciech Bozejko
چکیده

New parallel objective function determination methods for the job shop scheduling problem are proposed in this paper, considering makespan and the sum of jobs execution times criteria, however, the methods proposed can be applied also to another popular objective functions such as jobs tardiness or flow time. Parallel Random Access Machine (PRAM) model is applied for the theoretical analysis of algorithm efficiency. The methods need a fine-grained parallelization, therefore the approach proposed is especially devoted to parallel computing systems with fast shared memory (e.g. GPGPU, GeneralPurpose computing on Graphics Processing Units). & 2011 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...

متن کامل

Optimality of the flexible job shop scheduling system based on Gravitational Search Algorithm

The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...

متن کامل

Optimality of the flexible job shop scheduling system based on Gravitational Search Algorithm

The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...

متن کامل

Solving the Flexible Job Shop Problem on Multi-GPU

We propose the new framework of the distributed tabu search metaheuristic designed to be executed using a multi-GPU cluster, i.e. cluster of nodes equipped with GPU computing units. We propose a hybrid single-walk parallelization of the tabu search, where hybridization consists in examining a number of solutions from a neighborhood concurrently by several GPUs (multi-GPU). The methodology is de...

متن کامل

Improved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems

Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Computers & OR

دوره 39  شماره 

صفحات  -

تاریخ انتشار 2012