Nash equilibria for the multi-agent project scheduling problem with controllable processing times
نویسندگان
چکیده
This paper considers a project scheduling environment in which the activities of the project network are partitioned among a set of agents. Activity durations are controllable, i.e., every agent is allowed to shorten the duration of its activities, incurring a crashing cost. If the project makespan is reduced with respect to its normal value, a reward is offered to the agents and each agent receives a given ratio of the total reward. Agents want to maximize their profit. This problem is modeled as a non-cooperative game and Nash equilibria are analyzed. We characterize Nash equilibria in terms of the existence of certain types of cuts on the project network. We show that finding one Nash equilibrium is easy, while finding a Nash strategy that minimizes the project makespan is NP-hard in the strong sense. The particular case where each activity belongs to a different agent is also studied and some polynomial-time algorithms are proposed for this case.
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملA Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing
In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexibl...
متن کاملA Bi-Objective Airport Gate Scheduling with Controllable Processing Times Using Harmony Search and NSGA-II Algorithms
Optimizing gate scheduling at airports is an old, but also a broad problem. The main purpose of this problem is to find an assignment for the flights arriving at and departing from an airport, while satisfying a set of constraints.A closer look at the literature in this research line shows thatin almost all studies airport gate processing time has been considered as a fix parameter. In this res...
متن کاملBuilding a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...
متن کاملModified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations
In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- J. Scheduling
دوره 18 شماره
صفحات -
تاریخ انتشار 2015