Center for Multimodal Solutions for Congestion Mitigation (cms) Cms Project Title: Simulation-based Robust Optimization for Signal Timing and Setting Disclaimer and Acknowledgment

نویسندگان

  • Lihui Zhang
  • Yafeng Yin
  • Scott Washburn
  • Yingyan Lou
چکیده

....................................................................................................................................v EXECUTIVE SUMMARY ........................................................................................................... vi CHAPTER 1 BACKGROUND ...................................................................................................1 CHAPTER 2 CELL TRANSMISSION MODEL ........................................................................6 Model Introduction ..................................................................................................................6 Encapsulating CTM in Signal Timing Optimization ...............................................................8 CHAPTER 3 ENHANCED DETERMINISTIC SIGNAL OPTIMIZATION MODEL .............9 Objective Function ...................................................................................................................9 Constraints .............................................................................................................................11 CHAPTER 4 STOCHASTIC SIGNAL OPTIMIZATION MODEL ........................................19 CHAPTER 5 NUMERICAL EXAMPLES ................................................................................22 Simulation-Based Genetic Algorithm ....................................................................................22 Numerical Example I .............................................................................................................27 Numerical Example II ............................................................................................................33 CHAPTER 6 CONCLUDING REMARKS ...............................................................................40 REFERENCE .................................................................................................................................41

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Center for Multimodal Solutions for Congestion Mitigation (cms) Cms Project Title: Florida Long-distance Travel Characteristics and Their Potential Impacts on the Transportation System Disclaimer and Acknowledgement List of Tables List of Figures List of Abbreviations

The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the information presented herein. This document is disseminated under the sponsorship of the Department of Transportation University Transportation Centers Program in the interest of information exchange. The U.S. Government assumes no liability for the contents or use thereof. AB...

متن کامل

Cms Final Report Center for Multimodal Solutions for Congestion Mitigation (cms)

....................................................................................................................................4 EXECUTIVE SUMMARY .............................................................................................................5 CHAPTER 1 BACKGROUND ...................................................................................................6 CHAPTER 2 RE...

متن کامل

An Efficient Algorithm to Solve Utilization-based Model for Cellular Manufacturing Systems

The design of cellular manufacturing system (CMS) involves many structural and operational issues. One of the important CMS design steps is the formation of part families and machine cells which is called cell formation. In this paper, we propose an efficient algorithm to solve a new mathematical model for cell formation in cellular manufacturing systems based on cell utilization concept. The p...

متن کامل

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010