Performance of Coupled Product Development Activities with a Deadline
نویسندگان
چکیده
This paper explores the performance of coupled development activities by proposing a performance generation model (PGM). The goal of the PGM is to develop insights about optimal strategies (i.e., sequential, concurrent, or overlapped) to manage coupled design activities that share a fixed amount of engineering resources subject to performance and deadline constraints. Model analysis characterizes the solution space for the coupled development problem. The solution space is used to explore the generation of product performance and the associated dynamic forces affecting concurrent development practices. We use these forces to explain conditions under which concurrency is a desirable strategy. (Product Development; Design Process Modeling; Concurrent/Sequential/Overlapping Development; Component and System Performance Generation; Software Engineering)
منابع مشابه
Supplier Development Activities and Buying Firm’s Performance: An Empirical Investigation of Iranian SMEs
This study attempts to investigate the major antecedent factors that influence manufacturing SMEs intentions toward the implementation of supplier development activities in Iranian SMEs. In order to achieve this objective, the research constructs were developed. The conceptual framework underlying this study was based on the theories of supplier development activities and social capital. These...
متن کاملA Methodology for Product Performance Analysis under Effects of Multi-Physical Phenomena
Due to the development of science and technology, the computer has become a useful tool for supporting engineering activities in product design. Many computer aided tools such as CAD/CAM, product data management (PDM), product life cycle assessment (PLA), etc., have been popularly used in industry for reducing product development lead-time and increasing total product quality. However, the nume...
متن کاملA Non-Preemptive Two-Class M/M/1 System with Prioritized Real-Time Jobs under Earliest-Deadline-First Policy
This paper introduces an analytical method for approximating the performance of a two-class priority M/M/1 system. The system is fully non-preemptive. More specifically, the prioritized class-1 jobs are real-time and served with the non-preemptive earliest-deadline-first (EDF) policy, but despite their priority cannot preempt any non real-time class-2 job. The waiting class-2 jobs can only be s...
متن کاملA Comparative Study of Automotive NPD’S Performance Indicators between Industry and University Based Projects in a Developing Country.
New product development (NPD) is described in the literature as the transformation of a market opportunity into a product available for sale [ ]. In the automotive industry, within the context of ISO/TS (the automotive quality management system international standard), consists of Three main phases such as planning, Implementation and sales. There are also five sub phases called “Plan...
متن کاملA value analysis of new product development factors.in a Developed and Developing Country (Case Study)
New product development (NPD) is described in the literature as the transformation of a market opportunity into a product available for sale. In the automotive industry, within the context of ISO/TS16949:2002 (the automotive quality management system international standard), these related to the product realization process (PRP) which consists of Three main phases such as planning, Implem...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Management Science
دوره 47 شماره
صفحات -
تاریخ انتشار 2001