A Simulation Study on the Evaluation of Alternative Plans and Drawing an Upper Limit for the Productivity Improvement of a Flow Shop Considering the Work Waiting Time
نویسندگان
چکیده
Process improvement is a major requirement for a production manager who aims to reduce cost and achieve the target throughput. To achieve a target throughput, load balancing is commonly conducted, and resource investment is examined such as adoption of automation machine or hiring of new employee In this study, the impact of the waiting time caused by a moving conveyor is investigated based on discrete event simulation through a series of improvements scenarios, and the feasible design variables of conveyor line which can satisfy the target throughput is suggested.
منابع مشابه
Productivity Improvement through Line Balancing by Using Simulation Modeling
The typical problems facing garment manufacturers are long production lead time, bottlenecking, and low productivity. The most critical phase of garment manufacturing is the sewing phase, as it generally involves a number of operations or for the simple reason that it’s labor intensive. In assembly line balancing, allocation of jobs to machines is based on the objective of minimizing the workfl...
متن کاملProductivity Improvement of BOB T-shirt through Line Balancing Using Control Limit analysis and discrete event simulation (Case study: - MAA Garment and Textile Factory)
This study deals with line balancing of BOB T-shirt model with the help of control limit analysis and discrete event simulation of the assembly lines. In this study control limit analysis is used to measure the performance of the assembly line and used to show the bottleneck operations of the assembly line and line balancing technique improves the productivity of the sewing line of the model. ...
متن کاملAppointment process of open-heart surgery in Shahid Rajaei Heart Hospital using a discrete event simulation approach
Background: The waiting list is a list of selected patients in the surgical queue. If demand exceeds capacity, the waiting list grows rapidly, which may lead to unacceptable waiting for patients, especially those in need of acute medical care. Patients waiting for heart surgery are placed on the waiting list for surgery, and sometimes the waiting time is longer than patients expect. Reducing th...
متن کاملOn the Optimum Die Shape in Rod Drawing Process Considering Work-Hardening Effect of Material
The assessment of the influence of the work-hardening of material on the optimum die profile and drawing force in rod drawing process is the main objective of the present paper. The upper bound solution, based on the assumption of perfect plasticity, has been extended to consider the work-hardening of the material during the rod drawing process through curved dies. Analytical results of drawin...
متن کاملبهبود زمان انتظار بیماران مراجعه کننده به اورژانس با استفاده از شبیهسازی گسسته پیشامد
Introduction: Many simulation studies have been conducted in the hospitals and first in the emergency departments to increase the productivity. The first issue in the field of service quality and hence the patient right is “waiting time”. The goal of this study was to reduce patients waiting times, emergency service timing, modeling and improving using discrete event simulation. Methods: This...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2016