Generation of robust construction schedules using evolution strategies

نویسنده

  • Markus König
چکیده

In construction management the definition of a robust schedule is often more important than finding a time and cost efficient schedule. In nearly every construction project the planned schedule must be continually adapted due to disruptions. Therefore, it is imperative that a robust schedule should be generated regarding the different project objectives. In the context of planning and scheduling robust means that normal variations have no significant effects on the schedule. One appropriate concept to analyze the robustness is to simulate different disturbance scenarios. In the end, the schedule, that is nearly optimal and highly robust, is selected for execution. In this paper a concept is presented to generate robust construction schedules using evolution strategies. Therefore, it is necessary to define reasonable robustness criteria in order to evaluate different schedules.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Robust Scheduling in Construction Engineering

In construction engineering, a schedule’s input data, which is usually not exactly known in the planning phase, is considered deterministic when generating the schedule. As a result, construction schedules become unreliable and deadlines are often not met. While the optimization of construction schedules with respect to costs and makespan has been a matter of research in the past decades, the o...

متن کامل

A Budgeting Model for the Safety Unit of an Under Construction Metro Station in Tehran Using a Robust Optimization

Background: The construction of metro lines is a high-risk project. Using a budget-based model for the safety units of metro construction projects can help safety managers to spend optimal budget allocation. The purpose of this study was to plan a budget model based on safety unit performance in an under construction metro station for better budget allocation using robust optimization. Methods...

متن کامل

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

A New Approach Generating Robust and Stable Schedules in m-Machine Flow Shop Scheduling Problems: A Case Study

This paper considers a scheduling problem with uncertain processing times and machine breakdowns in industriall/office workplaces and solves it via a novel robust optimization method. In the traditional robust optimization, the solution robustness is maintained only for a specific set of scenarios, which may worsen the situation  for new scenarios. Thus, a two-stage predictive algorithm is prop...

متن کامل

Optimization of rotor shaft shrink fit method for motor using “Robust design”

This research is collaborative investigation with the general-purpose motor manufacturer. To review construction method in production process, we applied the parameter design method of quality engineering and tried to approach the optimization of construction method. Conventionally, press-fitting method has been adopted in process of fitting rotor core and shaft which is main component of motor...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011