Scheduling problems in master-slave model

نویسندگان

  • Joseph Y.-T. Leung
  • Hairong Zhao
چکیده

We consider scheduling problems in the master slave model, which was introduced by Sahni in 1996. The goal is to minimize the makespan and the total completion time. It has been shown that the problem of minimizing makespan is NP-hard. Sahni and Vairaktarakis developed some approximation algorithms to generate schedules whose makespan is at most constant times the optimal. In this paper, we show that the problem of minimizing total completion time is NP-hard in the strong sense. Then we develop algorithms to generate schedules whose total completion time and makespan are both bounded by some constants times their optimal values.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing mean flowtime and makespan on master-slave systems

The master-slave scheduling model is a new model recently introduced by Sahni. It has many important applications in parallel computer scheduling and industrial settings such as semiconductor testing, machine scheduling, etc. In this model each job is associated with a preprocessing task, a slave task and a postprocessing task that must be executed in this order. While the preprocessing and pos...

متن کامل

The impact of heterogeneity on master-slave scheduling

In this paper, we assess the impact of heterogeneity on scheduling independent tasks on master-slave platforms. We assume a realistic one-port model where the master can communicate with a single slave at any time. We target both on-line and off-line scheduling problems, and we focus on simpler instances where all tasks have the same size. While such on-line problems can be solved in polynomial...

متن کامل

Optimal Train Dispatching by Benders'-Like Reformulation

Train movements in railway lines are generally controlled by human dispatchers. As disruptions often occur, dispatchers take real-time scheduling and routing decisions in the attempt to minimize deviations from the o cial timetable. This optimization problem is called Train Dispatching. We represent it as a Mixed Integer Linear Programming model, and solve it by a Benders'-like decomposition wi...

متن کامل

Scheduling Divisible Workloads Using the Adaptive Time Factoring Algorithm

In the past years a vast amount of work has been done in order to improve the basic scheduling algorithms for master/slave computations. One of the main results from this is that the workload of the tasks may be adapted during the execution, using either a fixed increment or decrement (e.g. based on an arithmetical or geometrical ratio) or a more sophisticated function to adapt the workload. Cu...

متن کامل

A power-aware master and bridge scheduling scheme for bluetooth scatternets

We propose an intra-piconet and inter-piconet scheduling scheme for Bluetooth in which a master assigns priority to each slave based on its packet arrival rate, available buffer space and the number of messages stored in the master buffer for that slave. The number of times a particular slave is polled by its master in succession is dependent on the assigned priority. The slaves know the pollin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Annals OR

دوره 159  شماره 

صفحات  -

تاریخ انتشار 2008