Construction schedule review in GIS with a navigable 3D animation of project activities

نویسندگان

  • V. K. Bansal
  • Mahesh Pal
چکیده

This paper presents a Geographic Information Systems (GIS) based navigable 3D animation of project activities to visualise and review a construction project schedule as an alternative to the existing 4D CAD tools. Most of the commercial tools allow planners to build a 4D model but lack features like generation and manipulation of developed 4D model on a single platform. To facilitate the 4D model manipulation, both 3D model and the project schedule are developed within GIS. However, models generated by using popular commercial tool like y and the schedule generated in Primavera or Microsoft Project can also be utilised within the proposed approach. The animation of the project activities utilises dynamic linkage between activities of the schedule and the corresponding 3D components, thus, allowing detection of missing activities and logical errors in the project schedule. The database management capabilities of GIS are also utilised to maintain and update the construction resource database to facilitate the project planning. Most of the existing 4D technologies do not have project management capabilities and are used mainly for planning and design phases of a project. GIS based approach suggested in this paper may be used as the project management tool at any stage of the project. Along with ‘what’ is to be built ‘when’, a navigable 3D GIS based animation conveys ‘where’ in the space and offer powerful schedule visualisation, planning and querying capabilities. 2008 Elsevier Ltd and IPMA. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Application of geographic information systems in construction safety planning

Execution schedule and 2D drawings are generally used for hazards identification in the construction safety planning process. Planner visualises 2D drawings into a 3D model and mentally links its components with the respective activities defined in the schedule to understand the execution sequence in safety planning. Sequence interpretation and accordingly the hazards identification vary with t...

متن کامل

Geographic Information Systems in Evaluation and Visualization of Construction Schedule

Commercially available scheduling tools such as Primavera and Microsoft Project fail to provide information pertaining to the spatial aspects of construction project. A methodology using geographical information systems (GIS) is developed to represent spatial aspects of the construction progress graphically by synchronizing it with construction schedule. The spatial aspects are depicted by 3D m...

متن کامل

Animation of Construction Activities in Outdoor Augmented Reality

This paper describes research that investigates the application of outdoor Augmented Reality (AR) for three-dimensional graphical simulation of construction activities. The objective of the research is an AR-based platform that can be used with corresponding peripheral equipment (Head Mounted Display, GPS receiver, orientation tracker, and a portable computer) to generate a mixed view of the re...

متن کامل

Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games

In this paper, we give a state review of modeling methodologies for four-dimensional computer-aided design (4D CAD) and three-dimensional (3D) animation of operations simulation. We then present our efforts of integrating 4D CAD and 3D animation of operations simulation to facilitate the construction planning of the main stadium for the Beijing 2008 Olympic Games (nicknamed the ‘‘Bird’s Nest’’)...

متن کامل

A Case Study on Applying Lean Construction to Concrete Construction Projects

Lean construction is aimed at improving construction performance by eliminating wastes that do not add value to the customer. This project studies lean construction and its application in concrete construction projects at both the operation and project levels. In conjunction with a concrete contractor, actual concrete construction projects were observed, and problem areas contributing to delay ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015