O-Plan Project Evaluation Experiments

نویسندگان

  • Brian Drabble
  • Terri Lydiard
  • Austin Tate
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects

Today, the construction industry is facing intense competition and success in this competition depends on several factors. Project managers try to minimize project time and cost, carbon dioxide emission and at the same time maximizing the quality of project and its plan robustness. In this paper, study construction project scheduling considering a discrete trade-off between time, cost, quality,...

متن کامل

Developing a conceptual model based upon the Latin Hypercube Sampling for integrating OHS into project risk evaluation

Abstract Project management in construction industry, in many cases, is imperfect with respect to the integration of Occupational Health and Safety (OHS) risks. This imperfection exhibits itself as complications affecting the riskiness of industrial procedures and is illustrated usually by poor awareness of OHS within project teams. Difficulties on OHS regularly came about in the construction i...

متن کامل

Evaluation of Aqua Crop Computer Model in the Potato Under Irrigation Management of Continuity Plan of Jiroft Region, Kerman, Iran

The agricultural regions are running into difficulties, which are restrictive availability of water, successive appearing draughts, and overuse of ground water resources for supplemental water requirements. As a sample which is got from the farm is sent to the laboratory for testing and the laboratory works need devices. Hence, conducting farm experiments are expensive and time consuming to opt...

متن کامل

Evaluation of Aqua Crop Computer Model in the Potato Under Irrigation Management of Continuity Plan of Jiroft Region, Kerman, Iran

The agricultural regions are running into difficulties, which are restrictive availability of water, successive appearing draughts, and overuse of ground water resources for supplemental water requirements. As a sample which is got from the farm is sent to the laboratory for testing and the laboratory works need devices. Hence, conducting farm experiments are expensive and time consuming to opt...

متن کامل

O-Plan Evaluation Methodology and Experiments

ion The plan state has the capability to represent abstraction Operator abstraction decomposition of operators Goal abstraction goal ordering

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008