On-line Planning and Scheduling for High-speed Manufacturing

نویسندگان

  • Wheeler Ruml
  • Minh Binh Do
  • Markus P. J. Fromherz
چکیده

We describe a real manufacturing problem that lies between job shop scheduling and temporal planning. The setting is online in the sense that new jobs arrive asynchronously, perhaps several per second, while plans for previous jobs are being executed. We formalize the problem as a variant of STRIPS extended with action durations and resources. We present a hybrid algorithm for this problem that combines techniques from partial-order scheduling and state-space planning. No domain-specific search control is used. Our current implementation successfully controls two prototype plants and our technology is anticipated to enable a new line of products. By integrating planning and scheduling, we enable high productivity even for complex plants.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Human resources scheduling based on machines maintenance planning and human reliability level

In today's competitive market, quality has an important role in manufacturing system. The manufacturers attempt to maintain their production system in a proper condition to produce high quality products. One of the key factors to achieve this goal is maintenance policy. Most studies on maintenance focused on machines and less attention has been paid to human resources as the most important fact...

متن کامل

A novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study

Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...

متن کامل

Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

متن کامل

Study and Implementation of Lean Manufacturing in a Garment Manufacturing Company: Bangladesh Perspective

Lean manufacturing is a systematic approach to identifying and eliminating wastes (non-value added activities) through continuous improvement by conveying the product at the pull of the customer in pursuit of production. In a more basic term, more value with less work. Since lean manufacturing eliminates many of the problems associated with poor production scheduling and line balancing, lean ma...

متن کامل

Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment

This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005