Optimal planning for autonomous agents under time and resource uncertainty
نویسندگان
چکیده
In this paper we develop an approach for planning under time and resource uncertainty with task dependencies. We follow the line of research described by (Bresina et al., 2002), overcoming limitations of existing approaches: they only handle simple time constraints and assume a simple model of durations and resources’ uncertainty.In many domains, such as space applications (rovers, satellites), these assumptions are invalid. Our approach considers temporal and resource constraints and fully deals with their uncertainty. From a mission graph, we build a MDP that can be optimally solved by dynamic programming, even for large mission graphs.
منابع مشابه
Linear Time Varying MPC Based Path Planning of an Autonomous Vehicle via Convex Optimization
In this paper a new method is introduced for path planning of an autonomous vehicle. In this method, the environment is considered cluttered and with some uncertainty sources. Thus, the state of detected object should be estimated using an optimal filter. To do so, the state distribution is assumed Gaussian. Thus the state vector is estimated by a Kalman filter at each time step. The estimation...
متن کاملSCALABLE PLANNING UNDER UNCERTAINTY by
Autonomous agents that act in the real-world can often improve their success by capturing the uncertainty that arises because of their imperfect knowledge and potentially faulty actions. By making plans robust to uncertainty, agents can be prepared to counteract plan failure or act upon information that becomes available during plan execution. Such robust plans are valuable, but are often diffi...
متن کاملA novel bi-objective reliable location routing model considering impedance function under demand-side and supply-side uncertainty (A Case study)
Reliable location routing problem considers a location problem and a vehicle routing problem in order to select the optimal location of facilities and at the same time the optimal routes for vehicles considering the unexpected failure for facilities in which, all facilities may fail with a probability. In this paper, a bi-objective mathematical model has been developed to minimize the total cos...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کاملIntegrated Inspection Planning and Preventive Maintenance for a Markov Deteriorating System Under Scenario-based Demand Uncertainty
In this paper, a single-product, single-machine system under Markovian deterioration of machine condition and demand uncertainty is studied. The objective is to find the optimal intervals for inspection and preventive maintenance activities in a condition-based maintenance planning with discrete monitoring framework. At first, a stochastic dynamic programming model whose state variable is the ...
متن کامل