Scheduling with AND/OR Precedence Constraints

نویسندگان

  • Rolf H. Möhring
  • Martin Skutella
  • Frederik Stork
چکیده

In many scheduling applications it is required that the processing of some job be postponed until some other job, which can be chosen from a pregiven set of alternatives, has been completed. The traditional concept of precedence constraints fails to model such restrictions. Therefore, the concept has been generalized to so-called and/or precedence constraints which can cope with this kind of requirement. In the context of traditional precedence constraints, feasibility, transitivity, and the computation of earliest start times for jobs are fundamental, well-studied problems. The purpose of this paper is to provide efficient algorithms for these tasks for the more general model of and/or precedence constraints. We show that feasibility as well as many questions related to transitivity can be solved by applying essentially the same linear-time algorithm. In order to compute earliest start times we propose two polynomial-time algorithms to cope with different classes of time distances between jobs.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...

متن کامل

Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach

Through the lens of supply chain management, integrating process planning decisions and scheduling plans becomes an issue of great challenge and importance. Dealing with the problem paves the way to devising operation schedules with minimum makespan; considering the flexible process sequences, it can be viewed as a fundamental tool for achieving the scheme, too. To deal with this integration, t...

متن کامل

Modified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations

In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...

متن کامل

Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment

This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • SIAM J. Comput.

دوره 33  شماره 

صفحات  -

تاریخ انتشار 2004