Steel Hull Shipbuilding Cost Structure

نویسنده

  • Miguel Leal
چکیده

This study analyses the cost structure of the several processes associated with the shipbuilding industry. The analysed productive processes are: the cutting preparation procedures; the several steel plate cutting processes; the processes of hull plates and stiffeners forming; the associated transport and assembling of plates and profiles; and finally the welding processes. The paper includes 2 independent case studies that took place at different Portuguese shipyards and covering different aspects of the steel hull shipbuilding processes. 1 Case Study – Time and cost analysis of cutting preparation processes made by the design office, cutting/marking of steel plates and forming processes of stiffeners and hull plates, required for the construction of an 83m Hopper Barge, built by MPG, at LISNAVE Mitrena Shipyard, Portugal, 2010. 2 Case Study – Time and cost analysis of stiffeners cutting, steel plates and stiffeners assembly and welding, associated with the building of several blocks of an 80m fisheries supporting vessel by JOPERINOX Shipyard at Alverca, Portugal, 2008; It is expected at the end of the analysis of these 2 studies to achieve simple formulae of costs estimation inherit to each one of the productive processes analysed and also the cost of the ship’s steel hull. Ultimately creating a work base for future studies in order to improve and update these formulas by adding new corrective coefficients based on the type of the built ship or construction complexity of certain ship blocks. It was also developed, within this study, a simple Excel worksheet that will calculate several aspects of the construction budget and expected building times by adding simple input data.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Technical Notes on the Near Surface Experiments of Submerged Submarine

In this study, the experimental analysis on the bare hull resistance coefficient of submarine at snorkel depth is represented. The experiments are conducted in marine laboratory of Admiral Makarov University. The results are presented for surface condition and snorkel condition. Snorkel depth is regarded equal to one diameter of submarine hull beneath the water surface as usual in submarines. P...

متن کامل

Lightweight Construction for Advanced Shipbuilding - Recent Development

In this paper some recent advances in lightweight construction for modern shipbuilding are presented. Following a description of lightweight structures and their current use in shipbuilding, emphasis is put on naval applications of composites, and in particular on aspects related to cost benefit assessment and survivability. The following part reports on the use of adhesive bonding for superstr...

متن کامل

Generation of the 3D CAD model of the hull structure at the initial ship design stage and its application

Currently, all design information of a hull structure is being first defined on 2D drawings not 3D CAD model at the initial ship design stage and then transferred to following design stages through the 2D drawings. This is caused by the past design practice, limitation on time, and lack of shipbuilding CAD systems supporting the initial design stage. As a result, the following design tasks such...

متن کامل

Vibration Characteristics Analysis on Ship Propulsion System Taking Hull Deformations into Account

Original scientific paper Since an evident tendency of the shipbuilding is that the sizes of ships are larger and larger, the dynamic interactions between the propulsion system and ship hull in large scale ships are much severer than those of the small sized ships. Ship hull deformations caused by the action of heavy excited wave forces could affect the vibration characteristics of the propulsi...

متن کامل

Development of Carriage-type Welding Robot for Double Hull Assembly Line in Shipbuilding

This paper introduces a carriage-type welding robot which is to implement into double hull assembly line in shipbuilding. The developed robot consists of 5-axis carriage-type body, a controller, and a welding power supply and is capable of welding fully automatically such as a commercial industrial robot system without any interruption by an operator in a cell which consists of vertical weld-li...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012