The Crane Split and Sequencing Problem with Clearance and Yard Congestion Constraints in Container Terminal Ports
نویسندگان
چکیده
منابع مشابه
Yard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملYard Crane Pools and Optimum Layouts for Storage Yards of Container Terminals
As more and more container terminals open up all over the world, competition for business is becoming very intense for container terminal operators. They are finding out that even to keep their existing Sea Line customers, they have to make them happy by offering higher quality service. The quality of service they can provide depends on their operating policies and the design of the terminal la...
متن کاملMultiship Crane Sequencing with Yard Congestion Constraints
Crane sequencing in container terminals determines the order of ship discharging and loading jobs that quay cranes (QCs) perform so that the duration of vessels’ stay is minimized. The ship’s load profile, berthing time, number of available bays and QCs are considered. More importantly, clearance and yard congestion constraints need to be included, which respectively ensure that a minimum dista...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملA New Approach for Sequencing Loading and Unloading Operations in the Seaside Area of a Container Terminal
Due to the considerable growth in the worldwide container transportation, optimization of container terminal operations is becoming highly needed to rationalize the use of logistics resources. For this reason, we focus our study on the Quay Crane Scheduling Problem (QCSP), which is a core task of managing maritime container terminals. From this planning problem arise two decisions to be made: T...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2014