Modelling and managing disjunctions in scheduling problems

نویسندگان

  • Patrick Esquirol
  • Marie-José Huguet
  • Pierre Lopez
چکیده

In this paper we present a method for modeling and managing various constraints encountered in task scheduling problems. Our approach aims at characterizing feasible schedules through the analysis of the set of constraints and their interaction, regardless to any optimization criteria. This analysis is achieved by a constraint propagation process on a constraint graph and produces both restricted domains for the decision variables and an updated formulation of the initial constraints. The graphs usually used to model temporal constraints seem to be limited because they only allow the representation of strict precedence relations between two tasks. In order to model a larger variety of temporal constraints, particularly any constraint that connects two events (startor finish-time of a task), we propose a model called a Time-Bound-On-Node graph in which each task is featured by two nodes. Then it becomes possible to handle constraints on task durations, due for example to flexibilities in resource utilization. This kind of graph is not new and has already been investigated in related works on project planning and constraint satisfaction problems. But its processing and interpretation deserved to be developed, particularly for our purpose, which is the search for the necessary conditions of feasibility. With respect to conjunctive temporal constraints, the analysis is achieved with a polynomial algorithm based on the longest path search on a conjunctive TBON graph, yielding the necessary and sufficient conditions of feasibility. Taking account of resource constraints leads to defining disjunctive constraints. To this end, disjunctive sets of arcs are introduced, making the TBON graph non conjunctive. In this case, a complete characterization of feasibility cannot reasonably be faced, due to the combinatorial feature. Nevertheless, a polynomial algorithm that applies reduction and deletion rules on the non conjunctive part of the graph is proposed to restart new propagations on the conjunctive part until all deductions have been made.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modelling for Lazy Clause Generation

Lazy clause generation is a hybrid SAT and finite domain propagation solver that tries to combine the advantages of both: succinct modelling using finite domains and powerful nogoods and backjumping search using SAT technology. It has been shown that it can solve hard scheduling problems significantly faster than SAT or standard finite domain propagation alone. This new hybrid opens up many cho...

متن کامل

Modelling and Scheduling Lot Streaming Flexible Flow Lines

Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...

متن کامل

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...

متن کامل

An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems

In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • J. Intelligent Manufacturing

دوره 6  شماره 

صفحات  -

تاریخ انتشار 1995