Nature Inspired Meta-heuristics for Grid Scheduling: Single and Multi-objective Optimization Approaches
نویسندگان
چکیده
1 Centre for Quantifiable Quality of Service in Communication Systems, Norwegian University of Science and Technology, NO-7491 Trondheim, Norway [email protected] http://www.softcomputing.net 2 School of Computer Science and Engineering, Dalian Maritime University, 116026 Dalian, China 3 Department of Computer, Dalian University of Technology, 116023 Dalian, China [email protected] 4 Department of Computer Science, Faculty of Mathematics and Computer Science, Babeş Bolyai University, Kogalniceanu 1, Cluj-Napoca, 3400, Romania [email protected] 5 Dept. de Llenguatges i Sistemes Informàtics Universitat Politècnica de Catalunya C/Jordi Girona 1-3, 08034 Barcelona, Spain [email protected]
منابع مشابه
A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics
This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...
متن کاملNature Inspired Schedulers in Computational Grids
ARTICLE 1. Introduction Computational Grids (CGs) are a natural extension of classical distributed systems. CGs are expected to leverage unprecedented larger computing capacities by virtually joining together geographically distributed resources at large scale. To achieve this objective, the design of ecient Grid schedulers that map and allocate tasks and applications onto Grid resources is a k...
متن کاملAn Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm
In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...
متن کاملNew Approaches in Metaheuristics to Solve the Truck Scheduling Problem in a Cross-docking Center
Nowadays, cross-docking is one of the main concepts in supply chain management in which products received to a distribution center by inbound trucks which are directly to lead into outbound trucks with a minimum handling and storage costs as the main cost of a cross-docking system. According to the literature, several metaheuristics and heuristics are attempted to solve this optimization model....
متن کاملImproved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -