A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem

نویسندگان

  • Silvio A. de Araujo
  • Alistair R. Clark
چکیده

In a previous paper (Araujo et al. 2007), the authors proposed a lot sizing and sequencing model for a production process where a key material is prepared and then transformed into different final items. The lot sizing decisions concern not only the production of final items, but also that of the prepared material in order to take account of their sequence-dependent setup costs and times. The number of articles published in recent years shows the relevance of this problem in various industrial settings. In this paper, facility location reformulation and strengthening contraints are newly applied to improve the quality and computing time of the solution. Three alternative metaheuristics are used to fix the setup variables, resulting in much improved performance over previous research, especially regarding the use of the metaheuristics for larger instances.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups

A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking into account sequence-dependent setup costs and times, and then adapted for rolling horizon use. A relax-and-fix (RF) solution heuristic is proposed and computationally teste...

متن کامل

Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

متن کامل

The Finite Horizon Economic Lot Scheduling in Flexible Flow Lines

This paper addresses the common cycle multi-product lot-scheduling problem in flexible flow lines (FFL) where the product demands are deterministic and constant over a finite planning horizon. Objective is minimizing the sum of setup costs, work-in-process and final products inventory holding costs per time unite while satisfying the demands without backlogging. This problem consists of a combi...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

Single-item reformulations for a vendor managed inventory routing problem: Computational experience with benchmark instances

The Inventory Routing Problem (IRP) involves the distribution of one or more products from a supplier to a set of customers over a discrete planning horizon. The version treated here, the so-called Vendor Managed Inventory Routing Problem (VMIRP), is the Inventory Routing problem arising when the replenishment policy is decided a priori. We consider two replenishment policies. The first is know...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Computers & Industrial Engineering

دوره 65  شماره 

صفحات  -

تاریخ انتشار 2013