Correction to "Quantitative Methods for Tradeoff Analyses"

نویسندگان

  • A. Terry Bahill
  • Jesse Daniels
چکیده

In this equation, n represents the number of Figures of Merit (FoMs) that are to be combined, xi represents the output of the scoring function for the ith FoM and wi represents the weight of importance assigned to the ith FoM. The Product Tradeoff Function is commonly used for example in computing cost to benefit ratios and in doing risk analyses. Unfortunately, the published equation on page 195 multiplied the weight times the score, like this: f = ∏ i=1 n

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A comparative study of quantitative mapping methods for bias correction of ERA5 reanalysis precipitation data

This study evaluates the ability of different quantitative mapping (QM) methods as a bias correction technique for ERA5 reanalysis precipitation data. Climate type and geographical location can affect the performance of the bias correction method due to differences in precipitation characteristics. For this purpose, ERA5 reanalysis precipitation data for the years 1989-2019 for 10 selected syno...

متن کامل

Quantitative SPECT and planar 32P bremsstrahlung imaging for dosimetry purpose –An experimental phantom study

Background: In this study, Quantitative 32P bremsstrahlung planar and SPECT imaging and consequent dose assessment were carried out as a comprehensive phantom study to define an appropriate method for accurate Dosimetry in clinical practice. Materials and Methods: CT, planar and SPECT bremsstrahlung images of Jaszczak phantom containing a known activity of 32P were acquired. In addition, Phanto...

متن کامل

Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile

This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...

متن کامل

Quantitative Methods for Tradeoff Analyses

Practicing engineers often find the tools and techniques used for investigating alternative system designs to be cumbersome or complicated. This article will show that these systems engineering tools and techniques are in fact quite simple and can provide critical insight into how stakeholder requirements drive the engineering design process. This helps ensure that customer requirements are sat...

متن کامل

A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management

In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Systems Engineering

دوره 8  شماره 

صفحات  -

تاریخ انتشار 2005