Multi-GB/s IC Test Challenges and Solutions

نویسنده

  • Burnell G. West
چکیده

Production test and device I/O characterization are different tasks. Measurements and analysis associated with these different tasks need quite different tools. 1 Serial Data Links – the future is “bright” – ! " # $ #% ! & ' ( # ) ( " * # + , ( . / # 2 Design Qualification vs Production Test It is absolutely necessary to distinguish clearly between design qualification/characterization and the sort of test necessary to guarantee that a particular device is manufactured properly. Yet to sort one from the other is no mean task. It only takes a few extra ohms of interconnect to marginalize a good design; these few extra ohms will displace a transition by a few but unacceptably large number of picoseconds. Each bit in a high-speed serial data stream can be characterized by two key parameters: unit interval and individual edge displacement, expressed as a fraction of unit interval. Edge displacement is often referred to as jitter. Jitter is an unfortunate term, as it masks what is actually going on. Yes, some edges are out of place, but why are they? Displaced edges are created by intersymbol interference, internal systematic path or propagation delay errors, clock phase error, and random noise. These errors must be identified and minimized during the design qualification phase; the design is acceptable if error rate is sufficiently below target unless the product is defective. Key point: “random noise” in semiconductors is not very large. RJ in excess of 1 ps is more likely to be instrumentation noise than true circuit noise, or else is uncorrelated systematic error. This error is likely to be correctable in design. Laboratory equipment is generally capable of acquiring the data necessary to characterize today’s I/O designs. However, it is a costly mistake to attempt to translate these characterization tasks into a production test requirement. Measuring “jitter” in a production test environment is unneeded. What might be measured (and compared to design minimum, nominal, and maximum) are bit-by-bit displacements focused specifically on the structure of the specific serializers or deserializers in the signal path. This requirement is derived from the concept of defect-based testing: each element in the circuit (whether transistor, passive component, or interconnect) has a target quality requirement; if it is not manufactured to this quality requirement then something – something specific – is wrong. Yet this overall approach is insufficient by itself. It misses the tight coupling of the serial data stream to its internal self-aligned clock. If this clock is too erratic, then perfect serializing or deserializing circuitry will break. Conclusion: production test has two requirements: qualify the clock and qualify the bit generators or extractors. There should be no need for long data streams, or concomitant long test times. ITC INTERNATIONAL TEST CONFERENCE 0-7803-8106-8/03 $17.00 Copyright 2003 IEEE Panel P8.5

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Production Test Challenges And Possible Solutions For Multiple GB/s ICs

As the data rate reaches 1 Gb/s or beyond, most of the communication standards use the serial link architecture due to its capability of delivering data at a rate up to 100 Gb/s and beyond. This serial link is an asynchronized system with a bit clock embedded in the transmitting data bit stream. Transmitting multiple Gb/s data for a single channel over a distance of ~10 m < L < a few 1000 km ar...

متن کامل

BiCMOS integrated circuits for high - speed serial

Considerable progress has been made in integrating multi-Gb/s functions into silicon chips for dataand telecommunication applications. This paper reviews the key requirements for implementing such functions in monolithic form and describes their implementation in the IBM SiGe BiCMOS technology. Aspects focused on are the integration of 10 –13-Gb/s serializer/deserializer chips with subpicosecon...

متن کامل

A Multi-objective Transmission Expansion Planning Strategy: A Bilevel Programming Method

This paper describes a methodology for transmission expansion planning (TEP) within a deregulated electricity market. Two objective functions including investment cost (IC) and congestion cost (CC) are considered. The proposed model forms a bi-level optimization problem in which upper level problem represents an independent system operator (ISO) making its decisions on investment while in the l...

متن کامل

Accurate and affordable packet-train testing systems for multi-Gb/s networks

Communication networks face nowadays a relentless increase in traffic load. Multi-Gb/s links are becoming widespread, and network devices are under a continuous stress, so testing whether they guarantee the specified throughput or delay is a must. Software-based solutions, such as the packet-train traffic injection, were adequate for lower speeds, but they have turned inaccurate in the current ...

متن کامل

Will "Heisenberg Uncertainty Principle" Hold For Designing and Testing Multiple GB/s ICs?

1. Introduction At multiple Gb/s data rates, virtually all the communication architectures converge to serial where the clock timing is recovered at the receiver via various clock recovery schemes. While serial communication architectures and technologies were first developed and implemented in network centric communication systems that are characterized by relatively low volume, high cost, and...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2003