An inventory sharing and allocation method for a multi-location service parts logistics network with time-based service levels

نویسندگان

  • Erhan Kutanoglu
  • Mohit Mahajan
چکیده

Number: 007-0663 An Inventory Sharing and Allocation Method for a Multi-location Service Parts Logistics Network with Time-based Service Levels Erhan Kutanoglu Graduate Program in Operations Research and Industrial Engineering Department of Mechanical Engineering The University of Texas at Austin [email protected] POMS 18th Annual Conference Dallas, Texas, U.S.A. May 4 to May 7, 2007 Abstract We consider a model to allocate stock levels at warehouses in a service parts logistics network. The network is a two-echelon distribution system with one central warehouse with infinite capacity and a number of local warehouses, each facing Poisson demands from geographically dispersed customers. Each local warehouse uses a potentially different base stock policy. The warehouses are collectively required to satisfy time-based service targets: Certain percentages of overall demand need to be satisfied from facilities within specified time windows. These service levels not only depend on the distance between customers and the warehouses, but also depend on the part availabilities at the warehouses. Moreover, the warehouses share their inventory as aWe consider a model to allocate stock levels at warehouses in a service parts logistics network. The network is a two-echelon distribution system with one central warehouse with infinite capacity and a number of local warehouses, each facing Poisson demands from geographically dispersed customers. Each local warehouse uses a potentially different base stock policy. The warehouses are collectively required to satisfy time-based service targets: Certain percentages of overall demand need to be satisfied from facilities within specified time windows. These service levels not only depend on the distance between customers and the warehouses, but also depend on the part availabilities at the warehouses. Moreover, the warehouses share their inventory as a

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Closed-loop Supply Chain Inventory-location Problem with Spare Parts in a Multi-Modal Repair Condition

In this paper, a closed-loop location-inventory problem for spare parts is presented. The proposed supply chain network includes two echelons, namely (1) distribution centers (DCs) and repairing centers (RCs) and (2) operational bases. Multiple spare parts are distributed among operational bases from distribution centers in the forward supply chain and failed spare parts from operational bases ...

متن کامل

A Congested Double Path Approach for a Hub Location-allocation Problem with Service Level at Hubs

In this paper an uncapacitated multiple allocation p-hub median problem is discussed. The model minimizes the transportation cost based on inventory service level at hubs through double paths between hubs. Inventory service level is defined as the percent of inventory shortage of vehicles at hubs according to passengers demand and replenishment time of vehicles. A real data from 25 nodes of mun...

متن کامل

Policy Model for Sharing Network Slices in 5G Core Network

As mobile data traffic increases, and the number of services provided by the mobile network increases, service load flows as well, which requires changing in the principles, models, and strategies for media transmission streams serving to guarantee the given nature of giving a wide scope of services in Flexible and cost-effective. Right now, the fundamental question remains what number of netwo...

متن کامل

Benefits of Considering Inventory in Logistics Network Design Problems with Time-based Service Constraints

We study the integrated logistics network design and inventory stocking problem as characterized by the interdependency of the design and stocking decisions in service parts logistics. These two sets of decisions have been usually considered sequentially in practice, and the associated problems have been tackled separately in the research literature. The overall problem is typically further com...

متن کامل

Benefits of Considering Inventory in Service Parts Logistics Network Design Problems with Time-based Service Constraints

We study the integrated logistics network design and inventory stocking problem as characterized by the interdependency of the design and stocking decisions in service parts logistics. These two sets of decisions have been usually considered sequentially in practice, and the associated problems have been tackled separately in the research literature. The overall problem is typically further com...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 194  شماره 

صفحات  -

تاریخ انتشار 2009