A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock

نویسندگان

  • Mojtaba Shakeri
  • Malcolm Yoke-Hean Low
  • Stephen John Turner
  • Eng Wah Lee
چکیده

This paper studies truck scheduling in a resource-constrained crossdock. The problem decides on the sequence of incoming and outgoing trucks at the dock doors of the crossdocking terminal, subject to the availability of crossdock resources including dock doors and material handling systems. The resources are assumed non-preemptive making it necessary to address the feasibility of the problem before its optimality as it might be entrapped in deadlock and no feasible solution is produced. The paper thus aims at developing an algorithmic approach capable of establishing solution feasibility for truck scheduling problem instances of various types and difficulty levels which at the same time can be readily implemented in an industrial setting. The proposed approach is a two-phase heuristic algorithm where in the first phase, a heuristic search is deployed to construct a feasible sequence of trucks for the assignment to dock doors and in the second, a rule-based heuristic is used to assign each sequenced truck to a proper dock door, subject to a limited number of forklifts, such that significant savings in the truck schedule length are achieved. Extensive experiments are conducted to evaluate the efficiency of the algorithm in terms of deadlock avoidance and solution quality. The evaluation is carried out against the solutions generated by the exact mathematical model of the problem and a constructive heuristic developed for a similar truck scheduling problem. Experimental results demonstrate that the proposed algorithm is robust in avoiding deadlock and generates feasible solutions for the instances where the other two approaches cannot. Furthermore, significant improvement in the solution quality is achieved by augmenting the algorithm to a re-starting heuristic.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Truck Scheduling Problem in Logistics of Crossdocking

This report addresses an important crossdocking planning operation which is the scheduling of trucks at crossdocking terminals. The study focuses on the problem in a resource-constrained crossdock. The truck scheduling problem in this scenario decides on the succession of incoming and outgoing trucks at the dock doors of the crossdocking terminal, subject to the availability of the crossdock re...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS

In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 39  شماره 

صفحات  -

تاریخ انتشار 2012