Maintenance policy for a two-components system with stochastic dependences and imperfect monitoring
نویسندگان
چکیده
The goal of this work is to optimize a preventive maintenance policy for a multi-component system with imperfect monitoring, i.e the monitoring procedure may exhibit non-detection problems in case of failure.
منابع مشابه
Condition Based Maintenance for Two-Component Systems with Reliability and Cost Considerations
This paper studies a maintenance policy for a system composed of two components, which are subject to continuous deterioration and consequently stochastic failure. The failure of each component results in the failure of the system. The components are inspected periodically and their deterioration degrees are monitored. The components can be maintained using different maintenance actions (repair...
متن کاملApplication of Multivariate Control Charts for Condition Based Maintenance
Condition monitoring is the foundation of a condition based maintenance (CBM). To relate the information obtained from the condition monitoring to the actual state of the system, it is usually required a stochastic model. On the other hand, considering the interactions and similarities that exist between CBM and statistical process control (SPC), the integrated models for CBM and SPC have been ...
متن کاملAn integrated production and preventive maintenance planning model with imperfect maintenance in multi-state system
Production planning and maintenance are two important problems in manufacturing systems. Despite the relationship exists between these two problems due to sudden failures and production capacity occupied by maintenance activities, each of these problems planned separately and as a result program and model efficiencies reduce in the real world. The aim of integrated production and maintena...
متن کاملReliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants
Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...
متن کاملA Stochastic Model for Indirect Condition Monitoring Using Proportional Covariate Model
This paper introduces a model to make decision on the maintenance of a mechanical component subject to condition monitoring. A stochastic model is used to determine what maintenance action should be taken at a monitoring check and the follow up inspection times. The condition of component has a stochastic relation with measurements. A new state space model is developed and used, to predict the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2002