Scheduling of periodic connections with flexibility

نویسندگان

  • Wei Su
  • Galen H. Sasaki
  • Ching-Fong Su
  • Ashok Balasubramanian
چکیده

A wavelength division multiplexed link is to be time shared by a given collection of optical connections. The system is time slotted with period T. Each optical connection has a prescribed duration per time period. In addition, it has a prescribed time window within which its duration may begin. The size of the window is the amount of time flexibility there is to schedule the optical connection. The problem considered is to set up the optical connections. Formulas are provided to show the relationship between wavelength efficiency and the “burstiness” and time flexibility of the connections. In addition, simple heuristic algorithms are presented that perform well under simulations for randomly generated optical connections.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

JIT single machine scheduling problem with periodic preventive maintenance

This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...

متن کامل

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES

In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...

متن کامل

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...

متن کامل

Handling Non-periodic Events Together with Complex Constrained Tasks in Distributed Real-time Systems

In this paper we show how off-line scheduling and fixed priority scheduling (FPS) can be combined to get the advantages of both the capability to cope with complex timing constraints while providing run-time flexibility. We present a method to take advantage of the flexibility provided by FPS while guaranteeing complex constraint satisfaction on periodic tasks. We provide mechanisms to include ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Optical Switching and Networking

دوره 3  شماره 

صفحات  -

تاریخ انتشار 2006