Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression Thesis
نویسنده
چکیده
Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research seeks to identify significant factors that may influence, or serve as indicators of, potential cost overruns. The study uses data on 243 construction projects over a full range of project types and scopes gathered from an existing United States Air Force construction database. The author uses multiple linear regression to analyze the data and compares the proposed model to the common practice of assigning contingency funds. The multiple linear regression model provides better predictions of actual cost overruns experienced. Based on the performance metric used, the model sufficiently captures 44% of actual cost overruns versus current practices capturing only 20% The proposed model developed in this study only uses data that would be available prior to the award of a construction contract. This allows the model to serve as a planning tool throughout the concept and design phases. The model includes project characteristics, design performance metrics, and contract award process influences. This research supports prior findings of a relationship between design funding and design performance as well as the influence of the contract award process on cost overruns. While the proposed model captures 44% of actual cost overruns, its application reduces average contingency budgeting error from -11.2% to only -0.3% over the entire test
منابع مشابه
The Maturing Concept of Estimating Project Cost Contingency - a Review
Contingency is a ubiquitous component of project cost estimating. This paper provides a review of the literature pertaining to the estimating of project cost contingency. It describes the flaws of the tradition percentage method for estimating project cost contingency and sets out more robust estimation methods regression analysis, Monte Carlo simulation and artificial neutral networks. In part...
متن کاملExperimental Evaluation of Algorithmic Effort Estimation Models using Projects Clustering
One of the most important aspects of software project management is the estimation of cost and time required for running information system. Therefore, software managers try to carry estimation based on behavior, properties, and project restrictions. Software cost estimation refers to the process of development requirement prediction of software system. Various kinds of effort estimation patter...
متن کاملTime Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry
This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...
متن کاملESTIMATING THE PARAMETERS OF A FUZZY LINEAR REGRESSION MODEL
Fuzzy linear regression models are used to obtain an appropriate linear relation between a dependent variable and several independent variables in a fuzzy environment. Several methods for evaluating fuzzy coefficients in linear regression models have been proposed. The first attempts at estimating the parameters of a fuzzy regression model used mathematical programming methods. In this the...
متن کاملDEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY
Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2006