Trade and... Problems, Cost-Benefit Analysis and Subsidiarity

نویسنده

  • Joel P. Trachtman
چکیده

This article analyses the conflict between trade values and other values ('trade and ... problems'), such as environmental protection, labour rights or free competition, as It Is addressed by the principal legal devices available to address such conflicts ('trade-off devices') In the dispute resolution context In the European Union, the GATT/World Trade Organization system and In the United States federal system. These trade-off devices Include anti-discrimination rules, simple means-ends rationality tests, least trade restrictive alternative tests, proportionality tests, balancing tests and cost-benefit analysis. A separate cost-benefit analysis methodology Is developed to choose among these devices In particular circumstances. From the simple standpoint of maximization of the sum of benefits of trade and of regulation, cost-benefit analysis would, tautologically, be selected. However, full cost-benefit analysis is nowhere In use as a trade-off device. This paper begins to explain this apparent paradox by suggesting reasons, including administrative, distributive, moral and theoretical concerns, why this approach Is not applied. It then explores these reasons In order to evaluate retreats from full cost-benefit analysis to the trade-off devices actually in use. Finally, the author seeks to comprehend these trade-off devices as determinants of the allocation of regulatory jurisdiction between central and component governments: of

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

The Effects of China's Growth in Manufacturing Sector in the U.S. Economy

T his paper investigates the gain of bilateral trade between China and U.S. in manufacturing sectors when both countries play a role in asymmetric (biased) growth of  international trade. Our model includes a special case of Biased Growth Theory in international trade. We collected labor productivity, export and import data by using classification of manufacturing industries, for U.S...

متن کامل

A long-term cost-benefit analysis of national anti-desertification plans in Iran

     Desertification was recognized in Iran several decades ago. This phenomenon has gradually affected half the provinces in the country, where droughts exacerbate problems in these drylands. In response, the government has been active in providing considerable funds and human resources to halt desertification through investing in national research and executive projects over the last fifty ye...

متن کامل

Developing a Bi-level Objective Model of Risk-Cost Trade-off for Solving Locating-Routing Problem in Transportation of Hazardous Material

Allocating and routing problems in the field of transportation engineering are generally solved using the objective function of minimizing transport cost. Transport risk is a main concern in hazardous material transportation, mainly dependent on the vision of decision makers (national and/or local authorities). In this research work, a trade-off approach has been proposed to determine the safes...

متن کامل

A Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem

Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each act...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005