Building Foundations before Technology: An Operation Model for Digital Citizen Engagement in Resource Constrained Contexts

نویسندگان

  • Caroline Pade-Khene
  • Hannah Thinyane
چکیده

Citizen engagement in developing countries is seen as a ‘game changer’ for development, as citizens can play a key role in contributing to service delivery decisions that hold government accountable for their actions. Recently, there has been a drive to adopt digitally innovative approaches to support social accountability monitoring in developing countries. This is especially pertinent with the growing use of technology, specifically mobile technology, where in some rural areas it is estimated that approximately 80% of the population own a mobile phone. However, digital citizen engagement in developing countries is more complex than imagined, as such initiatives are faced with a lack of awareness of civic rights and education, despondency among citizens based on a lack of effective channels to hold government accountable, a lack of government responsiveness, and a lack of capacity to use and apply innovative approaches effectively. This paper presents a case study of a digital citizen engagement project called MobiSAM (Mobile Social Accountability Monitoring), which uses mobile technology to support two-way communication between citizens and local government, on basic service delivery issues. The operation model of MobiSAM is based on five key components which include: building government responsiveness and citizen engagement capacity, stakeholder engagement, iterative and incremental technology development, citizen education and training, and comprehensive evaluation for learning throughout the project. What is unique about this project is that it has evolved from lessons learned in phase 1.0 after 4 years of operation, to phase 2.0 that was initiated in 2016, hence building on lessons learned and reflecting on successful and challenging aspects. The operation model is not static, as it evolves as the project team learns to operate within the uncertain context. The lessons learned from the MobiSAM approach can be used to support the implementation of digital citizen engagement initiatives in similar global contexts.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An integrated Assessment System of Citizen Reaction towards Local Government Social Media Accounts

Agovernmentshouldusesocialmediaforcommunicatingwithitscitizen.Theengagement index score is one of the methods for assessing the rate of governmental success in using social media as a tool in establishing interactive relationships with its citizen. In general, the engagement index score is obtained by calculating the number of posts, number of likes and comments, and so forth on a single social...

متن کامل

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

A Simplified Approach to Stakeholder Engagement in Natural Resource Management: The Five-Feature Framework

We distill complex frameworks for stakeholder engagement into five main principles that scientists and natural resource managers can use in planning stakeholder engagement efforts. Many natural resource management professionals, including practitioners and scholars, increasingly recognize the need for, and potential benefits of, engaging stakeholders in complex decision-making processes, yet th...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017