Object-oriented modeling of construction operations for schedule-cost integrated planning, based on BIM
نویسندگان
چکیده
The study is aimed to develop a method to integrate time and schedule data of construction projects using object-oriented modeling. Although, many researchers have recognized the importance of data integration and have suggested methods to associate timeand cost-related data, the information models and methodologies developed to integrate time and cost information are not being utilized widely in daily practice. The reason for this includes that current construction management information systems do not yet provide the functionality to efficiently deal with time and cost information to better aid project managements. Therefore, an object-oriented modeling methodology based on BIM is suggested in this research, in which the time and cost data integration is achieved by parameterizing construction operations in objects. For observing applicability of the modeling method, a prototype has been developed using JAVA that this paper presents a discussion about implementing the integration model in the programming language as well.
منابع مشابه
BIM-based Integrated Framework for Detailed Cost Estimation and Schedule Planning of Construction Projects
With the increasing popularity of Building Information Modeling (BIM), several research studies have focused on its application in the construction industry, and advancements such as developments of BIM-based tools for construction scheduling and cost estimating have been carried out. Nevertheless, these tools are each developed only for one particular aspect of construction management, such as...
متن کاملBIM-Integrated Construction Operation Simulation for Just-In-Time Production Management
Traditional construction planning, which depends on historical data and heuristic modification, prevents the integration of managerial details such as productivity dynamics. Specifically, the distance between planning and execution brings cost overruns and duration extensions. To minimize variations, this research presents a Building Information Modeling (BIM)-integrated simulation framework fo...
متن کاملEvaluation of the Use of BIM Tools for Construction Site Utilization Planning
Construction Site Utilization Planning (CSUP), also known as jobsite layout planning, has the potential to improve the efficiency of the construction process, enhance the schedule and budgetary performance of a project, and improve the safety of construction operation. Traditionally, this planning has been done using two dimensional paper based design or AutoCAD / PDF files. The data rich three...
متن کاملModelsaz: An Object-Oriented Computer-Aided Modeling Environment
Modeling and simulation of processing plants are widely used in industry. Construction of a mathematical model for a plant is a time-consuming and error-prone task. In light of extensive advancements in computer science (both hardware and software), computers are becoming a necessary instrument in industrial activities. Many software tools for modeling, simulation and optimization of proces...
متن کاملIntegration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games
In this paper, we give a state review of modeling methodologies for four-dimensional computer-aided design (4D CAD) and three-dimensional (3D) animation of operations simulation. We then present our efforts of integrating 4D CAD and 3D animation of operations simulation to facilitate the construction planning of the main stadium for the Beijing 2008 Olympic Games (nicknamed the ‘‘Bird’s Nest’’)...