A two-machine flowshop problem with processing time-dependent buffer constraints - An application in multimedia presentations

نویسندگان

  • Feng-Cheng Lin
  • Jen-Shin Hong
  • Bertrand M. T. Lin
چکیده

To have a quality multimedia presentation through networks, its presentation lag needs to be controlled. One way to reduce the lag is to prefetch the media objects before their due dates. This paper explores techniques for optimizing the object sequence in a prefetch-enabled TV-like presentation. An optimal solution is the one with which the presentation lag is minimized. We formulate the problem into a two-machine flowshop scheduling problem with a single chain precedence constraint and a player-side buffer constraint. The player-side buffer is “processing time-dependent” and distinguished from the conventional item-based intermediate buffer constraints discussed in previous flowshop studies. We prove the problem to be strongly NP-hard. A branch and bound algorithm equipped with four lower bounds and an NEH-based upper bound is developed. The simulation results show that the average gaps between the overall lower bounds and the NEH-based upper bound are less than 3% for problems with a large buffer size, and less than 13% for problems with a small buffer size and high density of precedence constraints. For applications where the media objects are delivered through extremely busy servers with which only very restricted CPU resources can be allocated for computation, the CDS-based algorithm provides better sequences than the NEH-based algorithm. 2008 Elsevier Ltd. All rights reserved.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

MILP models and valid inequalities for the two-machine permutation flowshop scheduling problem with minimal time lags

In this paper, we consider the problem of scheduling on two-machine permutation flowshop with minimal time lags between consecutive operations of each job. The aim is to find a feasible schedule that minimizes the total tardiness. This problem is known to be NP-hard in the strong sense. We propose two mixed-integer linear programming (MILP) models and two types of valid inequalities which aim t...

متن کامل

Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors

This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...

متن کامل

Two meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning

This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...

متن کامل

Minimizing Total Weighted Tardiness in a Flexible Flowshop Environment Considering Batch Processing Machines

Scheduling in production environments is used as a competitive tool to improve efficiency and respond to customer requests. In this paper, a scheduling problem is investigated in a three-stage flexible flowshop environment with the consideration of blocking and batch processing. This problem has been inspired by the charging and packaging line of a large battery manufacturer. In this environmen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • Computers & OR

دوره 36  شماره 

صفحات  -

تاریخ انتشار 2009