Real-Time Problem-Solving with Contract Algorithms
نویسندگان
چکیده
This paper addresses the problem of building an interruptible real-time system using contract algorithms. Contract algorithms offer a tradeoff between computation time and quality of results, but their run-time must be determined when they are activated. Many AI techniques provide useful contract algorithms that are not interruptible. We show how to optimally sequence contract algorithms to create the best interruptible system with or without stochastic information about the deadline. These results extend the foundation of real-time problemsolving and provide useful guidance for embedding contract algorithms in applications.
منابع مشابه
Applications of two new algorithms of cuckoo optimization (CO) and forest optimization (FO) for solving single row facility layout problem (SRFLP)
Nowadays, due to inherent complexity of real optimization problems, it has always been a challenging issue to develop a solution algorithm to these problems. Single row facility layout problem (SRFLP) is a NP-hard problem of arranging a number of rectangular facilities with varying length on one side of a straight line with aim of minimizing the weighted sum of the distance between all facility...
متن کاملSolving a generalized aggregate production planning problem by genetic algorithms
This paper presents a genetic algorithm (GA) for solving a generalized model of single-item resource-constrained aggregate production planning (APP) with linear cost functions. APP belongs to a class of pro-duction planning problems in which there is a single production variable representing the total production of all products. We linearize a linear mixed-integer model of APP subject to hiring...
متن کاملMeta-heuristic Algorithms for an Integrated Production-Distribution Planning Problem in a Multi-Objective Supply Chain
In today's globalization, an effective integration of production and distribution plans into a unified framework is crucial for attaining competitive advantage. This paper addresses an integrated multi-product and multi-time period production/distribution planning problem for a two-echelon supply chain subject to the real-world variables and constraints. It is assumed that all transportations a...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1999