Data Mining and Simulation Applied to a Staff Scheduling Problem
نویسنده
چکیده
Staa scheduling is a complex problem encountered in almost all large businesses. Available manpower and skills must be deployed as eeectively as possible, while being exible enough to cope with the unexpected. This paper shows how high end PC technology in data-mining and simulation, as opposed to super-computing techniques, were applied to staa-scheduling in a large commercial organisation, where randomly uctuating demand and a requirement for a simple, xed schedule meant that optimisation techniques were not the most appropriate approach to the problem.
منابع مشابه
Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کاملA Hybrid Modeling for Continuous Casting Scheduling Problem
This paper deals with a multi-agent-based interval type-2 fuzzy (IT2F) expert systemfor scheduling steel continuous casting. Continuous caster scheduling is a complex and extensiveprocess that needs expert staff. In this study, a distributed multi-agent-based structure is proposed as asolution. The agents used herein can cooperate with each other via various communication protocols.To facilitat...
متن کاملA Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...
متن کاملAn Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...
متن کاملScheduling Single-Load and Multi-Load AGVs in Container Terminals
In this paper, three solutions for scheduling problem of the Single-Load and Multi-Load Automated Guided Vehicles (AGVs) in Container Terminals are proposed. The problem is formulated as Constraint Satisfaction and Optimization. When capacity of the vehicles is one container, the problem is a minimum cost flow model. This model is solved by the highest performance Algorithm, i.e. Network Simple...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1999