A Possible Upgrade for the Srs Rf System
نویسندگان
چکیده
The worlds first dedicated source for synchrotron radiation, the Synchrotron Radiation Source (SRS) at Daresbury, UK is now 20 years old. During its operational lifetime, the control and stability of the electron and photon beams have been significantly improved, to ensure continued reliable operation, in order to necessitate various lattice and insertion device (ID) upgrades [1][2]. The SRS currently utilises four 500MHz accelerating cavities, which can provide a maximum of 2.1MV accelerating voltage, equating to ~300mA of stored beam current at 2GeV. To operate the SRS at this beam current level routinely for users, would undoubtedly be very difficult due to cavity induced beam instabilities. As a possible way of upgrading the SRS to operate at these beam current levels and beyond, it is proposed to replace the existing SRS RF cavities with two new higher order mode (HOM) damped cavities. This would enable beam currents up to 1Ampere to be stored both reliably and with a higher degree of stability. The availability of two additional straight sections would then offer the possibility of introducing two high field MPW devices. This paper details the new cavity design, highlighting the associated RF system modifications that would become necessary.
منابع مشابه
Progress with the Srs Upgrade Project
The project to upgrade the SRS with two more high field insertion devices is now well under way. The 2 T multipole wigglers are scheduled for installation towards the end of 1998, following construction and full magnetic testing presently in progress. Several modifications to the storage ring have already been made including the installation of one of the narrow gap vacuum vessels. Preliminary ...
متن کاملSuperconducting Rf System Upgrade for Short Bunch Operation of Cesr*
The CESR luminosity upgrade plan calls for shortening bunch length to 1 cm. Such bunch length can be achieved by installing two more superconducting cavities to increase total RF voltage. The RF system upgrade necessary to accommodate this change is discussed.
متن کاملSsrl Rf System Upgrade*
The Stanford Synchrotron Radiation Laboratory started its operation as a parasitic light source in 1973, becoming a fully dedicated user facility in 1992. A project was approved in 1998 to upgrade the storage ring to a third generation source. In order to sustain higher current in a tightly reconfigured magnetic lattice, it became necessary to upgrade the RF system from the present 5-cell cavit...
متن کاملPenalties and sex reassignment surgery (SRS) after a punishment crime
One of important subject and discussion issue in medical sciences that caused occurrence of new legal and jurisprudence issues in the society, is sex reassignment surgery (SRS). Although in the past, these discussions have been existed more or less, nowadays due to technological progress and medical science achievements, new aspects of this subject have emerged. Despite different views concerni...
متن کاملSemi-quantitative segmental perfusion scoring in myocardial perfusion SPECT: visual vs. automated analysis
Introduction: It is recommended that the physician apply at least a semi-quantitative segmental scoring system in myocardial perfusion SPECT. We aimed to assess the agreement between automated semi-quantitative analysis using QPS (quantitative Perfusion SPECT) software and visual approach for calculation of summed stress score (SSS), summed rest score (SRS) and summed difference score (SDS). ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2001