Application of the Toyota Production System improves core laboratory operations.

نویسندگان

  • Joe Rutledge
  • Min Xu
  • Joanne Simpson
چکیده

To meet the increased clinical demands of our hospital expansion, improve quality, and reduce costs, our tertiary care, pediatric core laboratory used the Toyota Production System lean processing to reorganize our 24-hour, 7 d/wk core laboratory. A 4-month, consultant-driven process removed waste, led to a physical reset of the space to match the work flow, and developed a work cell for our random access analyzers. In addition, visual controls, single piece flow, standard work, and "5S" were instituted. The new design met our goals as reflected by achieving and maintaining improved turnaround time (TAT; mean for creatinine reduced from 54 to 23 minutes) with increased testing volume (20%), monetary savings (4 full-time equivalents), decreased variability in TAT, and better space utilization (25% gain). The project had the unanticipated consequence of eliminating STAT testing because our in-laboratory TAT for routine testing was less than our prior STAT turnaround goal. The viability of this approach is demonstrated by sustained gains and further PDCA (Plan, Do, Check, Act) improvements during the 4 years after completion of the project.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Strategic New JIT

This paper proposes “New JIT”, a new principle of next generation management technology that contributes to corporate management. New JIT consists of a hardware system founded on three core elements (TMS—Toyota Marketing System, TDS—Toyota Development System, and TPS—Toyota Production System), and a software system (TQM-S) (total quality management utilizing statistical quality control (SQC)) t...

متن کامل

Adapting some Rules and Principles of TPS (Toyota Production System) to Software Development

The Toyota Production System (TPS) has been widely studied and copied by variouscompanies to improve several of their processes. However, many of them have not beensuccessful due to the fact that only the tools and tactics have been focused and the coreunderlying principles have been overlooked. There are examples of a few companies whichhave achieved cost savings and operationa...

متن کامل

Effect and Durability of Eight-Week of Core Stability Training on Body Balance and Force of Direct Foot Kick in Young Men Jeet Kune Do (Wushu) Players With Somatotype Emphasis

Objective: Since direct foot kick is one of the most important strikes in Jeet Kune Do, its effectiveness depends on both the force of the hit and balance control during and after the hit execution, this study undertaken to examine the effect and persistence of eight-week of core stability training on balance and force of a direct foot kick of elite young male Jeet Kune Do (Wushu) athletes. Me...

متن کامل

Lean supply chain: learning from the Toyota Production System

How did Toyota achieve its success? It all started with the first President of Toyota Motor Corporation, Kiichiro Toyoda, who set up the company's objective “to use small lot size with cheaper vehicles to compete with the cost of American motor companies by continuously reducing cost through waste elimination”. The second president, Eiji Toyoda, went further to improve Toyota's manufacturing pr...

متن کامل

Adapting some Rules and Principles of TPS (Toyota Production System) to Software Development

The Toyota Production System (TPS) has been widely studied and copied by various companies to improve several of their processes. However, many of them have not been successful due to the fact that only the tools and tactics have been focused and the core underlying principles have been overlooked. There are examples of a few companies which have achieved cost savings and operational efficienci...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • American journal of clinical pathology

دوره 133 1  شماره 

صفحات  -

تاریخ انتشار 2010