Preemptive scheduling with precedences and alternative resources

نویسنده

  • Roman Barták
چکیده

This paper presents a search algorithm solving an elastic scheduling problem with alternative resources, where a feasible schedule with minimal costs on resources is demanded. The proposed technique is based on detecting ”problematic” precedence constraints defined between activities processed on different resources. Assignment of alternative resources is realized as an extension of the search algorithm using overload checking. Preliminary experimental results show, that the proposed technique works well for problems with a smaller number of precedence constraints.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems

In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...

متن کامل

Schedulability Analysis of Distributed Real-Time Applications under Dependence and Several Latency Constraints

This paper focuses on the analysis of real-time non preemptive multiprocessor scheduling with precedence and several latency constraints. It aims to specify a schedulability condition which enables a designer to check a priori -without executing or simulatingif its scheduling of tasks will hold the precedences between tasks as well as several latency constraints imposed on determined pairs of t...

متن کامل

A Multiprocessor System with Non-Preemptive Earliest-Deadline-First Scheduling Policy: A Performability Study

This paper introduces an analytical method for approximating the performability of a firm realtime system modeled by a multi-server queue. The service discipline in the queue is earliestdeadline- first (EDF), which is an optimal scheduling algorithm. Real-time jobs with exponentially distributed relative deadlines arrive according to a Poisson process. All jobs have deadlines until the end of s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009